Attendees: Elton S., Dave D., Dan C., Ed B., Curtis M., Elliott W., David L. Report on Meeting with project management yesterday: They discussed how best involve DOE in detector review. How to spend $30k: Some money could be spent on FDC and CDC prototyping. Final collaboration meeting arrangements: Make sure we have all facilities and refreshments lined up. Design report: Need to update the CDR. BCAL: Build outside or inside the magnet? Cherenkov: Discussion over what is needed in a Cherenkov detector. A DIRC is estimated at $3M just for parts. Additionally, assembly would require a class "10" cleanroom and a large labor. Could we gain by using an aerogel detector in conjunction with a traditional gas Cherenkov.