JLab Hall-D meeting August 25,2004 D. Lawrence Attendees: Simon T., Chris C., Dave D., Vladimir, Elton S. Brian K., Elliott W., David L., Ed B. Agenda: o Grounding / AC power distribution (Chris) o DAQ, computer Summaries (Elliott and Dave) o Gas distribution (Brian) o Any remaining discussions on Cerenkov option Summaries: Elliott reported that a reorganization of the one page summaries is taking place old new ---- --- Trigger Trigger DAQ DAQ Software Electronics Computing Online/Slow controls Analysis/Simulation Software Computing Infrastructure Cherenkov options:Elton initiated a discussion of the Cherenkov detector like the DIRC used by BaBar. We really need to look at the Cherenkov design since the gas system has an efficiency dip in the exact wrong place of the momentum spectrum. Any type of ring imaging detecting system will cost significantly more than a gas system. With a new system, we have more trigger possibilities. Gas System: Detector group has taken responsibility for gas system. A preliminary report was requested by the time of the collaboration meeting next month. Grounding/AC power: Chris is working on a preliminary budget. He is coordinating with several others to implement a grounding plan based on a heavy copper grid which is buried under the concrete in the floor of the hall.