JLab Hall-D Meeting July 28,2004 D. Lawrence Attendees: David L, Dave D., Simon T., Elliott W., Dan C. Vardan G., Chris C., Elton S., Paul E., Vladimir Agenda: 1. - Grounding schemes for Hall D (Chris) 2. - Status of FDC project (Simon/Dan) 3. - Specifications (Paul E.) 0. Announcements: Friday Alex, Curtis, George and Elton will be onsite for a meeting with Christoph. There will also be a meeting with Civil on Friday afternoon. The meeting is organized by Rusty Sprouse at 1:15. The purpose will be to define what an A&E firm would do to begin the whole 12GeV upgrade. B. Cross and Stan approached Elton with interest in working on the gas system for the DC. 1. Clas-Note 91-019. Chris needs list of major power requirements, (magnet, HV ,...). He also needs a list of places for where clean power will be needed. Needs number of channels/detectors for review. HallB had a rebar grid layout before concrete was poured that is grounded. 2. DAQ works (again). Tried improving the grounding system with mixed results. Swapped out a lot of preamp boards. Have ArCO2 on FDC prototype. 3. Detector Matrix. No current distinction between charge at device and charge at electronics.