Hall D Maintenance Status Long Description

Click the Last Maintenance date to update when the last maintenance was performed

Click the Task to EDIT the long description of this task

Click here to add a new item to the Hall D maintenance maintainer

TASK Primary Contact Secondary Contact PERIOD (days) NEXT MAINTENANCE LAST MAINTENANCE
Target Compressor Fi jfoyles@jlab.org bunton@jlab.org 350 01/17/24 02/01/23

The following must be contacted and approved before servicing Filters. Contact James Brock- Ext.7860 LOCK-OUT OVERHEAD CRANE Turn Off Target Chiller 1-Isolate Supply/Return Ball Valves from Chiller Manifold. 2-Close Valve between Filter and Heat Exchanger 3-Attach Bleeder Coupling to Port and Bleed off residual pressure. 4-Un-screw canister bolt and remove Filter housing. 5-Pour water and used filter into 5 gal. bucket,(save for RADCON). 6-Inspect Teflon Seal,(o-ring) for damage. 7-Install new filter into Filter Canister. 8-Tighten Canister bolt making sure Housing does not twist while tightening. 9-Slowly open Supply Ball Valve on Chiller Manifold with Bleeder Coupling still in place. 10-When all air is out of system, disconnect Coupling. 11-Check for leaks. 12-Open Return Ball Valve on Chiller Manifold 13-Open Valve between Filter and Target Chiller.