Hall D Maintenance Status

Click the Last Maintenance date to update when the last maintenance was performed

Click the Task to view the long description of the task

Click here to add a new item to the Hall D maintenance maintainer

TASK Primary Contact Secondary Contact PERIOD (days) NEXT MAINTENANCE LAST MAINTENANCE
180 05/29/20 12/01/19
100ft/Lb Torque Wrch keithb@jlab.org dallen@jlab.org 365 04/29/23 04/29/22
150ft/lb Torque Wrch keithb@jlab.org dallen@jlab.org 365 04/29/23 04/29/22
250inlb Torque Wrenc keithb@jlab.org dallen@jlab.org 365 04/29/23 04/29/22
400ft/lb Torque Wren keithb@jlab.org dallen@jlab.org 365 06/21/23 06/21/22
90inlb Torque Wrench keithb@jlab.org dallen@jlab.org 365 06/21/23 06/21/22
Air Comp. Filter dallen@jlab.org bunton@jlab.org 365 12/07/23 12/07/22
Air Comp. Oil dallen@jlab.org bunton@jlab.org 365 12/07/23 12/07/22
Air System Relief spiegel@jlab.org whitey@jlab.org 1095 07/18/25 07/19/22
Air Tank Inspect spiegel@jlab.org whitey@jlab.org 1825 08/01/26 08/02/21
Air Tank Relief spiegel@jlab.org whitey@jlab.org 1095 07/18/25 07/19/22
Alcohol Bubbler dallen@jlab.org zihlmann@jlab.org 14 02/16/23 02/02/23
Alcohol Frig Coolent dallen@jlab.org spiegel@jlab.org 365 01/26/24 01/26/23
Ascroft 200PSI Gauge bunton@jlab.org dallen@jlab.org 350 08/11/23 08/26/22
Ascroft 60PSI Gauge bunton@jlab.org dallen@jlab.org 350 08/11/23 08/26/22
Ashcroft Gauge 600lb bunton@jlab.org dallen@jlab.org 330 07/22/23 08/26/22
Battery change out bunton@jlab.org dallen@jlab.org 360 07/06/23 07/11/22
BCAL DE-GASING VALVE jfoyles@jlab.org dallen@jlab.org 720 11/08/22 11/18/20
BCAL DS Chiller Filt jfoyles@jlab.org dallen@jlab.org 220 07/30/23 12/22/22
BCAL DS Loop Filter jfoyles@jlab.org dallen@jlab.org 220 07/30/23 12/22/22
BCAL US Chiller Filt jfoyles@jlab.org dallen@jlab.org 220 07/30/23 12/22/22
BCAL US Loop Filter jfoyles@jlab.org dallen@jlab.org 220 07/30/23 12/22/22
COMPCAL Chiller Filt jfoyles@jlab.org bunton@jlab.org 350 08/07/23 08/22/22
Crane Wire Rope Visu jfoyles@jlab.org bunton@jlab.org 30 02/08/23 01/09/23
Danfysik Ann. Maint. bunton@jlab.org Spiegel@jlab.org 365 09/26/23 09/26/22
Detector Agon 12 Pk. dallen@jlab.org pentchev@jlab.org 55 03/26/23 01/30/23
Detector CO2 Bottles dallen@jlab.org pentchev@jlab.org 31 03/02/23 01/30/23
DIRC ACME Grease keithb@jlab.org spiegel@jlab.org 365 01/11/24 01/11/23
DIRC N2 Purge Filter spiegel@jlab.org keithb@jlab.org 1095 07/30/24 07/31/21
DIRC N2 Relif Valves keithb@jlab.org spiegel@jlab.org 1500 02/17/27 01/09/23
DIRC Opl. Box Filter jrsteven@jlab.org bunton@jlab.org 180 07/03/23 01/04/23
DIRC UV lamp replace keithb@jlab.org dallen@jlab.org 1095 06/16/23 06/16/20
DIRC water filter keithb@jlab.org spiegel@jlab.org 368 01/12/24 01/09/23
DIRC water pump keithb@jlab.org spiegel@jlab.org 180 07/11/23 01/12/23
DIRC water quality keithb@jlab.org spiegel@jlab.org 100 04/19/23 01/09/23
Dnstrm solenoid trbo keithb@jlab.org dallen@jlab.org 365 05/12/23 05/12/22
Emergency Lighting keithb@jlab.org bunton@jlab.org 30 02/06/23 01/07/23
FCAL BL pump keithb@jlab.org dallen@jlab.org 360 01/07/24 01/12/23
FCAW Performance Log jfoyles@jlab.org 170 06/23/23 01/04/23
FDC Chiller Filter jfoyles@jlab.org dallen@jlab.org 240 08/31/23 01/03/23
Flood Gates Maint. jfoyles@jlab.org dallen@jlab.org 365 08/03/23 08/03/22
Gas Shed ODH bunton@jlab.org dallen@jlab.org 365 03/10/23 03/10/22
Gases Relief Valves spiegel@jlab.org whitey@jlab.org 1095 10/27/23 10/27/20
Goni Chnfal Rail Isp jfoyles@jlab.org Spiegel@jlab.org 365 11/30/23 11/30/22
Goni electronics boa keithb@jlab.org spiegel@jlab.org 1275 03/08/23 09/10/19
Goni Grease keithb@jlab.org spiegel@jlab.org 545 07/07/24 01/09/23
GTAW Performance Log jfoyles@jlab.org 170 06/23/23 01/04/23
Hall D LCW Filter jfoyles@jlab.org dallen@jlab.org 350 02/21/23 03/08/22
Hall D Motor Drives bunton@jlab.org jfoyles@jlab.org 182 09/07/22 03/09/22
hallduserspassword bunton@jlab.org 160 05/19/21 12/10/20
He Valve Membrane CK dallen@jlab.org bunton@jlab.org 30 02/17/23 01/18/23
Heat Ex-Changers bunton@jlab.org dallen@jlab.org 1825 02/28/27 03/01/22
Inst. Air Dryer dallen@jlab.org bunton@jlab.org 45 03/05/23 01/19/23
LCW Filters-BLGD 200 jfoyles@jlab.org dallen@jlab.org 350 08/09/23 08/24/22
LCW Filters-Tagger jfoyles@jlab.org dallen@jlab.org 350 08/09/23 08/24/22
Leak Detector #1 keithb@jlab.org bunton@jlab.org 365 09/01/23 09/01/22
Leak Detector #2 keithb@jlab.org bunton@jlab.org 365 09/01/23 09/01/22
Library ladder hardw bunton@jlab.org 365 03/11/23 03/11/22
PLC (CPU) Battery bunton@jlab.org hovanes@jlab.org 730.5 03/24/24 03/25/22
Pump #1 Spare(ESB) keithb@jlab.org bunton@jlab.org 365 01/09/24 01/09/23
Pump #10 CRYO Tank keithb@jlab.org bunton@jlab.org 365 09/01/23 09/01/22
Pump #3 Pair Spec keithb@jlab.org bunton@jlab.org 365 09/01/23 09/01/22
Pump #4 Spare(Hall) keithb@jlab.org bunton@jlab.org 365 08/11/23 08/11/22
Pump #5 Collimator C keithb@jlab.org bunton@jlab.org 365 09/01/23 09/01/22
pump #6 Spare(Hall) keithb@jlab.org bunton@jlab.org 365 01/18/24 01/18/23
pump #7 Goniometer keithb@jlab.org bunton@jlab.org 730 05/02/24 05/03/22
Pump #8 Tagger Magne keithb@jlab.org bunton@jlab.org 365 09/01/23 09/01/22
Pump #9 Tagger East keithb@jlab.org bunton@jlab.org 365 09/01/23 09/01/22
Pump out Saguaro spiegel@jlab.org keithb@jlab.org 350 03/07/23 03/22/22
PXI ADC Calibration beng@jlab.org zihlmann@jlab.org 365 08/22/23 08/22/22
PXI timestamp sync beng@jlab.org zihlmann@jlab.org 180 05/15/23 11/16/22
Refig. Thermometer dallen@jlab.org bunton@jlab.org 365 02/02/24 02/02/23
Replace Gas Shed UPS bunton@jlab.org dallen@jlab.org 1260 02/05/26 08/25/22
Roots Blower keithb@jlab.org bunton@jlab.org 365 09/01/23 09/01/22
SMAW Performance Log jfoyles@jlab.org 170 06/23/23 01/04/23
Solenoid warmup whitey@jlab.org Spiegel@jlab.org 450 03/26/23 12/31/21
Swap DS BCAL Chiller jfoyles@jlab.org bunton@jlab.org 350 12/07/23 12/22/22
Swap FDC chiller jfoyles@jlab.org bunton@jlab.org 350 12/19/23 01/03/23
Swap US BCAL Chiller jfoyles@jlab.org bunton@jlab.org 350 03/13/23 03/28/22
Tagger Mtr. Coupling bunton@jlab.org jfoyles@jlab.org 182 09/07/22 03/09/22
Tagger Thin Window i bunton@jlab.org whitey@jlab.org 365 01/21/23 01/21/22
Tagger UPS check/bat bunton@jlab.org spiegel@jlab.org 1260 10/22/25 05/11/22
Target Compressor Fi jfoyles@jlab.org bunton@jlab.org 350 02/28/23 03/15/22
Test hovanes@jlab.org hovanes.egiyan@gmail.com 60 02/25/23 12/27/22
Upstream pump #2 Sol keithb@jlab.org bunton@jlab.org 360 05/07/23 05/12/22
Vacuum Pump #003 keithb@jlab.org bunton@jlab.org 365 01/03/24 01/03/23
Vacuum Pump #004 keithb@jlab.org bunton@jlab.org 365 09/01/23 09/01/22
Vacuum Pump #005 keithb@jlab.org bunton@jlab.org 365 09/01/23 09/01/22
Vacuum pump #006 keithb@jlab.org bunton@jlab.org 365 09/01/23 09/01/22
VXS/VME AIR FILTERS bunton@jlab.org dallen@jlab.org 180 07/04/23 01/05/23