Hall D Maintenance Status

Click the Last Maintenance date to update when the last maintenance was performed

Click the Task to view the long description of the task

Click here to add a new item to the Hall D maintenance maintainer

TASK Primary Contact Secondary Contact PERIOD (days) NEXT MAINTENANCE LAST MAINTENANCE
180 05/29/20 12/01/19
100ft/Lb Torque Wrch keithb@jlab.org dallen@jlab.org 365 04/29/23 04/29/22
150ft/lb Torque Wrch keithb@jlab.org dallen@jlab.org 365 04/29/23 04/29/22
250inlb Torque Wrenc keithb@jlab.org dallen@jlab.org 365 04/29/23 04/29/22
400ft/lb Torque Wren keithb@jlab.org dallen@jlab.org 365 06/21/23 06/21/22
90inlb Torque Wrench keithb@jlab.org dallen@jlab.org 365 06/21/23 06/21/22
Air Comp. Filter dallen@jlab.org bunton@jlab.org 365 12/06/22 12/06/21
Air Comp. Oil dallen@jlab.org bunton@jlab.org 365 12/06/22 12/06/21
Air System Relief spiegel@jlab.org whitey@jlab.org 1095 07/18/22 07/19/19
Air Tank Inspect spiegel@jlab.org whitey@jlab.org 1825 08/01/26 08/02/21
Air Tank Relief spiegel@jlab.org whitey@jlab.org 1095 07/18/22 07/19/19
Alcohol Bubbler dallen@jlab.org zihlmann@jlab.org 25 05/09/22 04/14/22
Alcohol Frig Coolent dallen@jlab.org spiegel@jlab.org 365 01/26/23 01/26/22
Ascroft 200PSI Gauge bunton@jlab.org dallen@jlab.org 350 03/16/21 03/31/20
Ascroft 60PSI Gauge bunton@jlab.org dallen@jlab.org 350 03/16/21 03/31/20
Ashcroft Gauge 600lb bunton@jlab.org dallen@jlab.org 330 02/24/21 03/31/20
Battery change out bunton@jlab.org spiegel@jlab.org 360 07/10/22 07/15/21
BCAL DE-GASING VALVE jfoyles@jlab.org dallen@jlab.org 720 11/08/22 11/18/20
BCAL DS Chiller Filt jfoyles@jlab.org dallen@jlab.org 220 11/05/22 03/30/22
BCAL DS Loop Filter jfoyles@jlab.org dallen@jlab.org 220 11/05/22 03/30/22
BCAL US Chiller Filt jfoyles@jlab.org dallen@jlab.org 220 11/03/22 03/28/22
BCAL US Loop Filter jfoyles@jlab.org dallen@jlab.org 220 11/03/22 03/28/22
COMPCAL Chiller Filt jfoyles@jlab.org bunton@jlab.org 180 09/04/22 03/08/22
Crane Wire Rope Visu jfoyles@jlab.org bunton@jlab.org 30 06/05/22 05/06/22
Danfysik Ann. Maint. bunton@jlab.org stevensm@jlab.org 365 07/22/22 07/22/21
Detector Agon 12 Pk. dallen@jlab.org pentchev@jlab.org 45 06/09/22 04/25/22
Detector CO2 Bottles dallen@jlab.org pentchev@jlab.org 31 05/26/22 04/25/22
DIRC ACME Grease keithb@jlab.org stevensm@jlab.org 365 07/31/22 07/31/21
DIRC N2 Purge Filter spiegel@jlab.org stevensm@jlab.org 1095 07/30/24 07/31/21
DIRC N2 Relif Valves keithb@jlab.org stevensm@jlab.org 1500 09/08/25 07/31/21
DIRC Opl. Box Filter jrsteven@jlab.org bunton@jlab.org 180 12/12/20 06/15/20
DIRC UV lamp replace keithb@jlab.org dallen@jlab.org 730 06/16/22 06/16/20
DIRC water filter keithb@jlab.org stevensm@jlab.org 368 08/12/22 08/09/21
DIRC water pump keithb@jlab.org stevensm@jlab.org 180 07/30/22 01/31/22
DIRC water quality keithb@jlab.org stevensm@jlab.org 100 05/14/22 02/03/22
Emergency Lighting keithb@jlab.org bunton@jlab.org 30 03/30/22 02/28/22
FCAL BL pump keithb@jlab.org dallen@jlab.org 360 01/26/23 01/31/22
FCAW Performance Log jfoyles@jlab.org 170 06/20/22 01/01/22
FDC Chiller Filter jfoyles@jlab.org dallen@jlab.org 180 09/01/22 03/05/22
Flood Gates Maint. jfoyles@jlab.org dallen@jlab.org 365 06/28/22 06/28/21
Gas Shed ODH bunton@jlab.org dallen@jlab.org 365 03/10/23 03/10/22
Gases Relief Valves spiegel@jlab.org whitey@jlab.org 1095 10/27/23 10/27/20
Goni Chnfal Rail Isp jfoyles@jlab.org stevensm@jlab.org 365 07/12/22 07/12/21
Goni electronics boa keithb@jlab.org stevensm@jlab.org 910 03/08/22 09/10/19
Goni Grease keithb@jlab.org stevensm@jlab.org 545 09/19/22 03/23/21
GTAW Performance Log jfoyles@jlab.org 170 06/20/22 01/01/22
Hall D LCW Filter jfoyles@jlab.org dallen@jlab.org 350 02/21/23 03/08/22
Hall D Motor Drives bunton@jlab.org jfoyles@jlab.org 182 09/07/22 03/09/22
hallduserspassword sandoval@jlab.org 160 05/19/21 12/10/20
He Valve Membrane CK dallen@jlab.org bunton@jlab.org 31 04/25/22 03/25/22
Heat Ex-Changers bunton@jlab.org dallen@jlab.org 1825 02/28/27 03/01/22
Inst. Air Dryer dallen@jlab.org bunton@jlab.org 45 05/19/22 04/04/22
LCW Filters-BLGD 200 jfoyles@jlab.org dallen@jlab.org 350 06/14/22 06/29/21
LCW Filters-Tagger jfoyles@jlab.org dallen@jlab.org 350 06/14/22 06/29/21
Leak Detector #1 keithb@jlab.org bunton@jlab.org 365 08/08/22 08/08/21
Leak Detector #2 keithb@jlab.org bunton@jlab.org 365 01/31/23 01/31/22
Library ladder hardw Bobby Bubton Mark Stevens 365 03/11/23 03/11/22
PLC (CPU) Battery sandoval@jlab.org bunton@jlab.org 730.5 03/24/24 03/25/22
Pump #1 Spare(ESB) keithb@jlab.org bunton@jlab.org 365 07/22/21 07/22/20
Pump #10 CRYO Tank keithb@jlab.org bunton@jlab.org 365 08/04/22 08/04/21
pump #2 Solenoid Man keithb@jlab.org bunton@jlab.org 360 01/23/23 01/28/22
Pump #3 Pair Spec keithb@jlab.org bunton@jlab.org 365 07/30/22 07/30/21
Pump #4 Spare(Hall) keithb@jlab.org bunton@jlab.org 365 07/30/22 07/30/21
Pump #5 Collimator C keithb@jlab.org bunton@jlab.org 365 08/04/22 08/04/21
pump #6 Spare(Hall) keithb@jlab.org bunton@jlab.org 365 08/04/22 08/04/21
pump #7 Goniometer keithb@jlab.org bunton@jlab.org 730 05/02/24 05/03/22
Pump #8 Tagger Magne keithb@jlab.org bunton@jlab.org 365 08/04/22 08/04/21
Pump #9 Tagger East keithb@jlab.org bunton@jlab.org 365 08/04/22 08/04/21
Pump out Saguaro stevensm@jlab.org keithb@jlab.org 350 01/16/23 01/31/22
PXI ADC Calibration beng@jlab.org zihlmann@jlab.org 365 08/13/22 08/13/21
PXI timestamp sync beng@jlab.org zihlmann@jlab.org 180 05/12/22 11/13/21
Refig. Thermometer dallen@jlab.org bunton@jlab.org 365 01/27/23 01/27/22
Replace Gas Shed UPS spiegel@jlab.org stevensm@jlab.org 1825 08/24/22 08/25/17
Roots Blower keithb@jlab.org bunton@jlab.org 365 08/13/22 08/13/21
SMAW Performance Log jfoyles@jlab.org 170 06/20/22 01/01/22
Solenoid warmup whitey@jlab.org stevensm@jlab.org 360 12/30/22 01/04/22
Swap DS BCAL Chiller jfoyles@jlab.org bunton@jlab.org 350 08/22/22 09/06/21
Swap FDC chiller jfoyles@jlab.org bunton@jlab.org 350 02/18/23 03/05/22
Swap US BCAL Chiller jfoyles@jlab.org bunton@jlab.org 350 03/13/23 03/28/22
Tagger Mtr. Coupling bunton@jlab.org jfoyles@jlab.org 182 09/07/22 03/09/22
Tagger Thin Window i bunton@jlab.org whitey@jlab.org 365 01/21/23 01/21/22
Tagger UPS check/bat Bobby Bunton stevensm@jlab.org 1260 10/22/25 05/11/22
Target Compressor Fi jfoyles@jlab.org bunton@jlab.org 180 09/01/22 03/05/22
Test hovanes@jlab.org hovanes.egiyan@gmail.com 60 07/01/22 05/02/22
Vacuum Pump #003 keithb@jlab.org bunton@jlab.org 365 08/11/22 08/11/21
Vacuum Pump #004 keithb@jlab.org bunton@jlab.org 365 07/22/21 07/22/20
Vacuum Pump #005 keithb@jlab.org bunton@jlab.org 365 08/03/22 08/03/21
Vacuum pump #006 keithb@jlab.org bunton@jlab.org 365 07/22/21 07/22/20
VXS/VME AIR FILTERS sandoval@jlab.org 180 11/27/21 05/31/21