GlueX Experiment Document 1573-v3
[
DocDB Home
] [
Portal Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
] [
List Events
]
Barrel Calorimeter Construction Documentation
Document #:
GlueX-doc-1573-v3
Document type:
Manual
Submitted by:
Zisis Papandreou
Updated by:
Zisis Papandreou
Document Created:
30 Aug 2010, 14:02
Contents Revised:
20 Feb 2011, 11:03
Metadata Revised:
26 Apr 2012, 23:26
Viewable by:
Public document
Modifiable by:
Same as Viewable by
Quick Links:
Latest Version
Other Versions:
GlueX-doc-1573-v4
02 Feb 2018, 07:30
GlueX-doc-1573-v2
03 Feb 2011, 11:47
GlueX-doc-1573-v1
20 Feb 2011, 10:47
Abstract:
A package containing all documents associated with the construction of the GlueX Barrel Calorimeter (BCAL) modules/wedges, including procedures, changes to procedures, Quality Assurance plan, construction status quo and safety.
Files in Document:
BCAL Construction Manual
(BCAL Construction Manual.pdf, 15.7 MB)
BCAL Construction Manual - Part 2 (Statistics)
(BCAL Construction Manual.2.pdf, 206.0 kB)
BCAL Matrix Layup Procedures (text only)
(Construction-ProceduresText_v1.pdf, 176.8 kB)
BCAL Matrix Layup Procedures (with pictures)
(Construction-ProceduresTextPictures_v1.pdf, 15.2 MB)
BCAL Matrix Layup Procedures Changes/Updates v4 no signature
(BCAL_Matrix_LayupProcedure_Changes_v4.pdf, 43.6 kB)
BCAL Matrix Layup Procedures Changes/Updates v4 signed (PDF)
(Constr_proc_v4_signed.pdf, 47.7 kB)
Construction Status Quo
(Construction-StatusQuo_v2.pdf, 89.3 kB)
Fibre Attenuation Length Measurement Procedures
(FibreProcedures-AttenLen_v2.pdf, 71.3 kB)
Fibre Number of Photoelectron Measurement Procedures
(FibreProcedures-Photoelectrons_v2.pdf, 89.7 kB)
Lead Handling and Swaging Procedures
(LeadHandling-Instructions_v2.pdf, 108.2 kB)
Quality Assurance Plan
(QAPlan_v4.pdf, 227.4 kB)
Risk Assessment/Safety
(Construction-RiskAssessment_v1.pdf, 73.6 kB)
Updated Construction Manual (Draft)
(Updated Construction Manual (Draft).doc, 145.2 MB)
Other Files:
BCAL Matrix Layup Procedure Changes/Updates v3
(Construction-ProcedureChanges_v3.pdf, 67.9 kB)
BCAL Matrix Layup Procedure Changes/Updates v4 no author
(BCAL_Matrix_LayupProcedure Changes_v4.pdf, 43.3 kB)
Topics:
Detector Hardware
:
BCAL
Authors:
Zisis Papandreou
Keywords:
barrel
calorimeter
Notes and Changes:
Minor procedure updates (v4) have been implemented to improve the gluing of the first few lead sheets onto the aluminum base plate.
[
DocDB Home
] [
Portal Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
] [
List Events
]
DocDB
Version 8.8.6, contact
Document Database Administrators