Difference between revisions of "Introduction Shift"
(One intermediate revision by the same user not shown) | |||
Line 7: | Line 7: | ||
Key features of the Hall D subsystems can be found in the [https://misportal.jlab.org/jlabDocs/document.seam?id=79548 Summary of Hall D Subsytems (D00000-00-00-S006)] . | Key features of the Hall D subsystems can be found in the [https://misportal.jlab.org/jlabDocs/document.seam?id=79548 Summary of Hall D Subsytems (D00000-00-00-S006)] . | ||
Information and questions regarding the experimental hazards and mitigating measures should be referred to the | Information and questions regarding the experimental hazards and mitigating measures should be referred to the | ||
− | [https:// | + | [https://halldweb.jlab.org/hdops/wiki/index.php/Training_and_Documentation_Shift Documentations] such as RSAD, ESAD and COO |
Latest revision as of 18:24, 4 March 2015
This document defines the procedures used by non-experts to operate the experimental equipment in Hall D. It is part of the JLab experiment review process as defined in Chapter 3120 of the Jefferson Lab EHS&Q manual. The operating parameters for each detector subsystem will be determined by their respective expert owners and are not to be changed except under direction by the expert. The lists of experts for each subsystem are given in their respective sections along with information for the operator. Key features of the Hall D subsystems can be found in the Summary of Hall D Subsytems (D00000-00-00-S006) . Information and questions regarding the experimental hazards and mitigating measures should be referred to the Documentations such as RSAD, ESAD and COO