Difference between revisions of "Approved Procedures"
From Hall D Ops Wiki
Line 15: | Line 15: | ||
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)] | * [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)] | ||
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85366 Operation of the Hall D Cryo Target (D00000-03-00-P001)] | * [https://misportal.jlab.org/jlabDocs/document.seam?id=85366 Operation of the Hall D Cryo Target (D00000-03-00-P001)] | ||
+ | |||
+ | === Setup for CPP-NPP Experiment === |
Revision as of 15:32, 1 June 2022
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)
- Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)
- Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)
- Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)
- Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)
- Full list of procedures for the solenoid can be found under Solenoid Expert Documentation
- Operation of Muon MWPCs for CPP (ENP-22-130467-OSP)
- Training for Work in the FCAL Dark Room (D00000-01-06-P006)
- CDC installation procedure (D00000-00-00-P001)
- Testing and Installation of the FDC in the Hall D Solenoid (D00000-00-00-P002)
- Hall D Beam Line Vacuum Procedures (D00000-10-05-P001)
- Hall D FDC/CDC gas system oxygen purge procedure (D00000-10-02-P001)
- Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)
- Operation of the Hall D Cryo Target (D00000-03-00-P001)