There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure: | There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=32776 Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)] | * [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=32776 Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)] | ||
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=36947 Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)] | * [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=36947 Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)] | ||
− | |||
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=19709 Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)] | * [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=19709 Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)] | ||
− | * | + | * [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=22021 Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)] |
+ | * [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=21781 Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)] | ||
+ | ** Full list of procedures for the solenoid can be found under [[Solenoid Expert | Solenoid Expert Documentation]] | ||
+ | * [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=130467 Operation of Muon MWPCs for CPP (ENP-22-130467-OSP)] | ||
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791 Training for Work in the FCAL Dark Room (D00000-01-06-P006)] | * [https://misportal.jlab.org/jlabDocs/document.seam?id=78791 Training for Work in the FCAL Dark Room (D00000-01-06-P006)] | ||
+ | * [https://misportal.jlab.org/jlabDocs/document.seam?id=82403 CDC installation procedure (D00000-00-00-P001)] | ||
+ | * [https://misportal.jlab.org/jlabDocs/document.seam?id=81785 Testing and Installation of the FDC in the Hall D Solenoid (D00000-00-00-P002)] | ||
+ | * [https://misportal.jlab.org/jlabDocs/document.seam?id=81084 Hall D Beam Line Vacuum Procedures (D00000-10-05-P001)] | ||
+ | * [https://misportal.jlab.org/jlabDocs/document.seam?id=83368 Hall D FDC/CDC gas system oxygen purge procedure (D00000-10-02-P001)] | ||
+ | * [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)] | ||
+ | * [https://misportal.jlab.org/jlabDocs/document.seam?id=85366 Operation of the Hall D Cryo Target (D00000-03-00-P001)] | ||
+ | |||
+ | === Setup for CPP-NPP Experiment === | ||
+ | |||
+ | * [https://halldweb.jlab.org/DocDB/0056/005638/001/CPP_Lead_Target_Change_Procedure_v1.pdf Change from Full to Empty Target] | ||
+ | * [https://halldweb.jlab.org/DocDB/0056/005639/002/CPP_Lead_Absorber_Move_Procedure_v3.pdf Adjustment of Pb picture-frame absorber during commissioning] |
Latest revision as of 16:54, 3 June 2022
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)
- Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)
- Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)
- Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)
- Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)
- Full list of procedures for the solenoid can be found under Solenoid Expert Documentation
- Operation of Muon MWPCs for CPP (ENP-22-130467-OSP)
- Training for Work in the FCAL Dark Room (D00000-01-06-P006)
- CDC installation procedure (D00000-00-00-P001)
- Testing and Installation of the FDC in the Hall D Solenoid (D00000-00-00-P002)
- Hall D Beam Line Vacuum Procedures (D00000-10-05-P001)
- Hall D FDC/CDC gas system oxygen purge procedure (D00000-10-02-P001)
- Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)
- Operation of the Hall D Cryo Target (D00000-03-00-P001)