Difference between revisions of "Run Planing Meeting 2018-08-02"
From Hall D Ops Wiki
(→Agenda) |
(→Minutes) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 20: | Line 20: | ||
*Preparations [https://accweb.acc.jlab.org/hco/readiness?regionId=&groupId=&qualified= System Readiness] | *Preparations [https://accweb.acc.jlab.org/hco/readiness?regionId=&groupId=&qualified= System Readiness] | ||
*#Documentation and Schedule | *#Documentation and Schedule | ||
− | *## Part1: Aug. 23rd to Oct. 28th, E12-06-102 | + | *## Part1: Aug. 23rd to Oct. 28th, E12-06-102! (2.1 GeV/pass) |
*## Part2: Nov. 19th to Dec. 19th, low energy! (1.86 GeV/pass, 1.61 GeV/pass) | *## Part2: Nov. 19th to Dec. 19th, low energy! (1.86 GeV/pass, 1.61 GeV/pass) | ||
*## Run Number Range 50000- with "RunPeriod-2018-08" | *## Run Number Range 50000- with "RunPeriod-2018-08" | ||
− | *#Beam-line (Radiators, ....) | + | *#Beam-line (Radiators, Detectors, ....) |
+ | *## Diamonds, Amorphous, Converters, Absorbers | ||
+ | *## Hodoscope, Microscope, Radiation Monitors, Active Colimator, Profiler | ||
*#Magnets (Tagger, Solenoid, .....) | *#Magnets (Tagger, Solenoid, .....) | ||
− | *#Detectors (Standard, | + | *#Detectors (Standard, New, Test, ...) |
+ | |||
+ | == Minutes == | ||
+ | # Will need strait track data | ||
+ | # Status of the TAC detector is unclear. Current state may not be sufficient to make a 5% flux calibration. | ||
+ | # There are 2 diamonds available for the running: 20um and 50um, which diamond to use/start needs to be determined | ||
+ | # The thin converter will be used for pair spectrometer/ triple pol. | ||
+ | # Survey of the goniometer is needed. | ||
+ | # System Readiness is reset and hot checkout of all equipment is required and done within the next 2 weeks. | ||
+ | # Strait track running is requested. | ||
+ | # Test TRD detector operation requested for second part of the running period. |
Latest revision as of 08:56, 8 August 2018
Connect Information
To connect from the outside by phone please do the following
- To join via a Web Browser, https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- The moderator code is 8394
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
Specific instructions for connecting from JLab's Hall D conference room:
Turn polycon on if necessary (do it before turning the computer on) With the polycon, place a call at 199.48.152.152 Press # to enable the polycom keypad, then enter the meeting id: 660743227 and # You may have to unmute the microphone: #*4 Turn the computer on if needed
Agenda
- Preparations System Readiness
- Documentation and Schedule
- Part1: Aug. 23rd to Oct. 28th, E12-06-102! (2.1 GeV/pass)
- Part2: Nov. 19th to Dec. 19th, low energy! (1.86 GeV/pass, 1.61 GeV/pass)
- Run Number Range 50000- with "RunPeriod-2018-08"
- Beam-line (Radiators, Detectors, ....)
- Diamonds, Amorphous, Converters, Absorbers
- Hodoscope, Microscope, Radiation Monitors, Active Colimator, Profiler
- Magnets (Tagger, Solenoid, .....)
- Detectors (Standard, New, Test, ...)
- Documentation and Schedule
Minutes
- Will need strait track data
- Status of the TAC detector is unclear. Current state may not be sufficient to make a 5% flux calibration.
- There are 2 diamonds available for the running: 20um and 50um, which diamond to use/start needs to be determined
- The thin converter will be used for pair spectrometer/ triple pol.
- Survey of the goniometer is needed.
- System Readiness is reset and hot checkout of all equipment is required and done within the next 2 weeks.
- Strait track running is requested.
- Test TRD detector operation requested for second part of the running period.