Difference between revisions of "One Week Pause in Running"
From Hall D Ops Wiki
(→One Week Pause in Running) |
|||
Line 1: | Line 1: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
==One Week Pause in Running== | ==One Week Pause in Running== | ||
* Goal: Reinstall tagger detectors/electronics and check data. | * Goal: Reinstall tagger detectors/electronics and check data. | ||
Line 18: | Line 13: | ||
# Using reconstructed tracks find the location of the beam spot | # Using reconstructed tracks find the location of the beam spot | ||
− | + | [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Back to main Fall14 commissioning page] | |
− | + | ||
− | + | ||
− | + |
Revision as of 10:11, 21 August 2014
One Week Pause in Running
- Goal: Reinstall tagger detectors/electronics and check data.
- Schedule: Start Oct 8, duration 6 days depends on the accelerator program to be carried out meanwhile
- Responsibility: Hall D
- Priority: High
- Conditions:
- No beam, Tagger hall and Hall D are open.
- Acivities
- Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables.
- Analyze the data taken so far and identify possible problems.
- Use this downtime to fix the identified hardware issues.
- Using reconstructed tracks find the location of the beam spot