Difference between revisions of "Approved Procedures"
From Hall D Ops Wiki
Line 11: | Line 11: | ||
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81785 Testing and Installation of the FDC in the Hall D Solenoid (D00000-00-00-P002)] | * [https://misportal.jlab.org/jlabDocs/document.seam?id=81785 Testing and Installation of the FDC in the Hall D Solenoid (D00000-00-00-P002)] | ||
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81084 Hall D Beam Line Vacuum Procedures (D00000-10-05-P001)] | * [https://misportal.jlab.org/jlabDocs/document.seam?id=81084 Hall D Beam Line Vacuum Procedures (D00000-10-05-P001)] | ||
+ | * [https://misportal.jlab.org/jlabDocs/document.seam?id=83368 Hall D FDC/CDC gas system oxygen purge procedure (D00000-10-02-P001)] | ||
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)] | * [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)] | ||
Line 17: | Line 18: | ||
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure: | There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure: | ||
− | |||
* Cryogenic target. Will ''not'' be used during 2014 commissioning (Chris Keith) | * Cryogenic target. Will ''not'' be used during 2014 commissioning (Chris Keith) |
Revision as of 09:59, 27 March 2015
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)
- Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)
- Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)
- Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)
- Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)
- Full list of procedures for the solenoid can be found under Solenoid Expert Documentation
- Training for Work in the FCAL Dark Room (D00000-01-06-P006)
- CDC installation procedure (D00000-00-00-P001)
- Testing and Installation of the FDC in the Hall D Solenoid (D00000-00-00-P002)
- Hall D Beam Line Vacuum Procedures (D00000-10-05-P001)
- Hall D FDC/CDC gas system oxygen purge procedure (D00000-10-02-P001)
- Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)
DRAFT Procedures
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Cryogenic target. Will not be used during 2014 commissioning (Chris Keith)