Difference between revisions of "Gas System Commissioning"
From Hall D Ops Wiki
Line 3: | Line 3: | ||
* The gas system delivers an Argon-CO2 mixture to both the FDC and CDC wire chambers. It is always operational and should not stop feeding gas to the chambers. | * The gas system delivers an Argon-CO2 mixture to both the FDC and CDC wire chambers. It is always operational and should not stop feeding gas to the chambers. | ||
* During accelerator down-times when the wire chambers are not in operation the gas flow through the chambers is reduced and the alcohol bubbler system is bypassed. | * During accelerator down-times when the wire chambers are not in operation the gas flow through the chambers is reduced and the alcohol bubbler system is bypassed. | ||
− | * For general | + | * For general information and operation of the gas system see [[Gas_System_Shift |Gas system for shift takers]]. |
Revision as of 12:59, 22 September 2016
Gas System
- The gas system delivers an Argon-CO2 mixture to both the FDC and CDC wire chambers. It is always operational and should not stop feeding gas to the chambers.
- During accelerator down-times when the wire chambers are not in operation the gas flow through the chambers is reduced and the alcohol bubbler system is bypassed.
- For general information and operation of the gas system see Gas system for shift takers.