Difference between revisions of "Solenoid Expert"
From Hall D Ops Wiki
(→Operational Safety Procedure (OSP)) |
(→Procedure and Checklist) |
||
Line 14: | Line 14: | ||
*Hall D Solenoid Powered Operations OSP: [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=22021 FEL-13-22021-OSP] | *Hall D Solenoid Powered Operations OSP: [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=22021 FEL-13-22021-OSP] | ||
− | == | + | == Other Procedures and Checklists == |
− | + | *Solenoid Cooldown Checklists: [https://misportal.jlab.org/jlabDocs/document.seam?id=81510&cid=16269 D000000402-P003 Rev A] | |
− | + | *Solenoid Vacuum System Controls Check Procedure: [https://misportal.jlab.org/jlabDocs/document.seam?id=81089 D000000402P004] | |
− | + | *Hall D Solenoid System Hi-Pot Procedure: [https://misportal.jlab.org/jlabDocs/document.seam?id=81384 D000000402P006 RevA] | |
− | + | *Solenoid Voltage Tap Check List: [https://misportal.jlab.org/jlabDocs/document.seam?id=81703 D000000402-P010] | |
− | + | *Hall D Solenoid Pre Power-Up Checklists: [https://misportal.jlab.org/jlabDocs/document.seam?id=81652 D000000402P007] | |
− | + | *Hall D Solenoid Magnet Power Supply Maintenance Turn-on Checklist: [https://misportal.jlab.org/jlabDocs/document.seam?id=73852 D000001611P000 Rev A] | |
− | + | *Hall D Solenoid Magnet Power Supply Internal Interlock Checklist: [https://misportal.jlab.org/jlabDocs/document.seam?id=73853 D000001611P001 Rev B] | |
− | + | *Ground Fault Detector Rheostat Setting Procedure: [https://misportal.jlab.org/jlabDocs/document.seam?id=81635 D000000402P011] | |
− | + | *Hall D Solenoid System Hi-Pot Procedure: [https://misportal.jlab.org/jlabDocs/document.seam?id=81384 D000000402P006 RevA] | |
− | + | *Solenoid Quench Detector Tuning Procedure: [https://misportal.jlab.org/jlabDocs/document.seam?id=74214 D000000402P005] | |
− | + | *Hall-D Solenoid Commissioning Procedure: [https://misportal.jlab.org/jlabDocs/document.seam?id=81871 D000000402P002] | |
== Technical References == | == Technical References == |
Revision as of 17:40, 18 January 2017
Operation
Procedures: signed documents
Operational Safety Procedure (OSP)
- Hall D Solenoid Magnet - Cryogenic Operations: ENG-12-19709-OSP
- Hall D Solenoid Power Supply Test and Maintenance: -13-21781-OSP
- Hall D Solenoid Powered Operations OSP: FEL-13-22021-OSP
Other Procedures and Checklists
- Solenoid Cooldown Checklists: D000000402-P003 Rev A
- Solenoid Vacuum System Controls Check Procedure: D000000402P004
- Hall D Solenoid System Hi-Pot Procedure: D000000402P006 RevA
- Solenoid Voltage Tap Check List: D000000402-P010
- Hall D Solenoid Pre Power-Up Checklists: D000000402P007
- Hall D Solenoid Magnet Power Supply Maintenance Turn-on Checklist: D000001611P000 Rev A
- Hall D Solenoid Magnet Power Supply Internal Interlock Checklist: D000001611P001 Rev B
- Ground Fault Detector Rheostat Setting Procedure: D000000402P011
- Hall D Solenoid System Hi-Pot Procedure: D000000402P006 RevA
- Solenoid Quench Detector Tuning Procedure: D000000402P005
- Hall-D Solenoid Commissioning Procedure: D000000402P002
Technical References
Magnet
Power Supply
Cryogenics System
Programmable Logic Control (PLC)
PXI Fast DAQ System
Quench Detector
Ground Fault Detector
Old Wiki Page
https://halldweb1.jlab.org/wiki/index.php/Superconducting_Solenoid