Difference between revisions of "Approved Procedures"
From Hall D Ops Wiki
Line 1: | Line 1: | ||
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure: | There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=32776 Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)] | * [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=32776 Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)] | ||
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=36947 Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)] | * [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=36947 Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)] | ||
* Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents | * Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents | ||
− | |||
− | |||
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791 Training for Work in the FCAL Dark Room (D00000-01-06-P006)] | * [https://misportal.jlab.org/jlabDocs/document.seam?id=78791 Training for Work in the FCAL Dark Room (D00000-01-06-P006)] | ||
+ | |||
+ | ==Drafts== | ||
+ | |||
+ | * Gas System Operation (Scot Spiegel/ Dave Butler) | ||
+ | * Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen). | ||
+ | * Insertion/removal CDC (Tim Whitlatch) | ||
+ | * Vacuum / damage to radiators/converters (Tom Carstens) [[Media:Hall D Vacuum-Thin window procedures.pdf]] | ||
+ | * Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents | ||
+ | * Cryogenic target. Chris Keith will lead the OSP effort |
Revision as of 09:41, 23 June 2014
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)
- Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)
- Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
- Training for Work in the FCAL Dark Room (D00000-01-06-P006)
Drafts
- Gas System Operation (Scot Spiegel/ Dave Butler)
- Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).
- Insertion/removal CDC (Tim Whitlatch)
- Vacuum / damage to radiators/converters (Tom Carstens) Media:Hall D Vacuum-Thin window procedures.pdf
- Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
- Cryogenic target. Chris Keith will lead the OSP effort