Difference between revisions of "Approved Procedures"
From Hall D Ops Wiki
(→DRAFTS) |
(→DRAFTS) |
||
Line 7: | Line 7: | ||
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791 Training for Work in the FCAL Dark Room (D00000-01-06-P006)] | * [https://misportal.jlab.org/jlabDocs/document.seam?id=78791 Training for Work in the FCAL Dark Room (D00000-01-06-P006)] | ||
− | == | + | == DRAFT Procedures == |
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure: | There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure: |
Revision as of 07:35, 24 June 2014
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)
- Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)
- Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)
- Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)
- Training for Work in the FCAL Dark Room (D00000-01-06-P006)
DRAFT Procedures
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Hall D Detector Gas System Purge Procedure (Dave Butler)
- Installation/Removal of FDC (Bill Crahen).
- Insertion/removal CDC (Tim Whitlatch)
- Hall D Vacuum-Thin Window Procedures (Tom Carstens)
- Solenoid Vacuum System Check Procedures (George Biallas)
- Media:Hall D Solenoid Hi-Pot procedure.pdf
- Cryogenic target. (Chris Keith)