Difference between revisions of "Solenoid Operations"
(→The Solenoid Magnet) |
(→The Solenoid Magnet) |
||
Line 28: | Line 28: | ||
The full inductance of the solenoid is about 26 H. | The full inductance of the solenoid is about 26 H. | ||
− | [[File:halld_solenoid_field.png | | + | [[File:halld_solenoid_field.png | 600px ]] |
== Routine Operation == | == Routine Operation == |
Revision as of 17:39, 1 July 2014
Contents
The Solenoid Magnet
The principle analysis magnet for the GlueX spectrometer is a superconducting solenoid made from the Large Aperture Solenoid Spectrometer (LASS) solenoid built at Stanford Linear Accelerator Center (SLAC) in 1971. The LASS solenoid consists of four separate coils located in separated vacuum vessels. Three coils were later used a second time for the Muon decays into Electron and GAmma ray (MEGA) experiment at Los Alamos National Lab from 1993 through 1995. During the MEGA experiment, the coils had electrical shorts and leaks to the insulating vacuum along with deteiorated superinsulation and instrumentation. In order to use them for the GlueX experiment, all four LASS coils have been extensively repaired, refurbished and tested at Jefferson Lab. The four coils were then assembled in Hall-D. The final GlueX solenoid has a bore of 1.85~m and measures 4 m long.
The magnet consists of 4608 windings(turns) of conductor in total. The windings are grouped into 19 sub-coils and distributed in four coils. The conductor is made of two copper bars 7.62 mm wide and about 2 mm thick, with a band of about 1~mm thick NbTi superconductor composite soldered in between them. These double-pancake windings are not insulated at their sides and are separated by a 0.64 mm thick stainless steel band co-wound with the cable, and insulated from the cable on both sides by Mylar bands of 0.2 mm thick.
When powered with the maximum current of 1350 A, the solenoid generates a field close to 2 Tesla in the bore. The full inductance of the solenoid is about 26 H.
Routine Operation
Main Menu
Power Supply
Voltages
Cryogenic System
Vacuum System
Strain Gauges
Interlock
Interlocks
Expert personnel
The individuals responsible for checking that the solenoid is ready to take data and setting its operating parameters are shown in following table. Problems with normal operation of the solenoid should be referred to those individuals and any changes to their settings must be approved by them. Additional experts may be trained by the system owner and their name and date added to this table.
Name | Extension | Date of qualification |
---|---|---|
George Biallas - Solenoid | 269-7535 | June 12, 2014 |
Yi Qiang - Solenoid/PXI | 269-7237 | June 12, 2014 |
Mark Stevens - Power Supply | 269-6383 | June 12, 2014 |
Jonathan Creel - Cryogenics | 269-5925 | June 12, 2014 |
Dave Butler - PLC | 329-2583 | June 12, 2014 |