(Created page with "__TOC__ ==Tune Electron Beam== # Goal: Get electron beam to the dump in the tagger hall. # Responsibility: Accelerator, HallD, RadCon. # Conditions: #* Tagger hall equipment r...") |
(→Tune Electron Beam) |
||
Line 12: | Line 12: | ||
#* Check radiation levels in the tagger hall. | #* Check radiation levels in the tagger hall. | ||
#* Check for photons and radiation levels in the collimator cave. | #* Check for photons and radiation levels in the collimator cave. | ||
+ | ==Tune Photon Beam== | ||
+ | # Goal: Tune the photon beam to go through the collimator, the experimental target area, and into the photon beam dump. | ||
+ | # Responsibility: HallD, Accelerator, RadCon. | ||
+ | # Conditions: |
Revision as of 08:12, 2 July 2014
Contents
Tune Electron Beam
- Goal: Get electron beam to the dump in the tagger hall.
- Responsibility: Accelerator, HallD, RadCon.
- Conditions:
- Tagger hall equipment removed or shielded. This includes the microscope (TAGM) and the electronics.
- Pulsed beam may be used.
- No radiator installed.
- Collimator blocks the photon beamline to Hall D.
- Activities:
- Tune beam to the dump, check the beam specification.
- Check radiation levels in the tagger hall.
- Check for photons and radiation levels in the collimator cave.
Tune Photon Beam
- Goal: Tune the photon beam to go through the collimator, the experimental target area, and into the photon beam dump.
- Responsibility: HallD, Accelerator, RadCon.
- Conditions: