Difference between revisions of "Solenoid Expert"

From Hall D Ops Wiki
Jump to: navigation, search
(Operational Procedure and Checklist)
(Magnet)
Line 14: Line 14:
  
 
=== Magnet ===
 
=== Magnet ===
 +
 +
==== Inductance ====
  
 
=== Power Supply ===
 
=== Power Supply ===

Revision as of 10:25, 2 July 2014

Procedure

Operational Safety Procedure (OSP)

  • Power Supply [M:\halld_engineering\Solenoid\Commissioning\OSP\Hall D Solenoid Power Supply OSP.doc]
  • Cryogenic Operations [M:\halld_engineering\Released_documents\HALL_D_SOLENOID\OSP - Cryogenic Operations.doc]
  • Hall D SOlenoid Powered Operations [M:\halld_engineering\Solenoid\Commissioning\OSP\OSP - Hall D Solenoid Powered Operations.doc]

Procedure and Checklist

  • Magnet Turn-ON Procedure [M:\halld_engineering\Solenoid\Improvements after Aug'13 Test\140617Solenoid turn on trackingTracking.xlsx]

Technical Reference

Magnet

Inductance

Power Supply

Cryogenics System

Programmable Logic Control (PLC)

PXI Fast DAQ System

Quench Detector

Ground Fault Detector