The production rate during this week was reduced as a result of several events, never-the-less we had >50% up time. On our side, the FDC chiller tripped due to overheating as a result of blocked chilled-water supply. The supply was restored by cleaning the needle valve and replacing the filter but the chiller was not functional. Later att