Approved Procedures
From Hall D Ops Wiki
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)
- Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)
- Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)
- Training for Work in the FCAL Dark Room (D00000-01-06-P006)
DRAFTS
- Gas System Operation (Scot Spiegel/ Dave Butler)
- Installation/Removal of FDC (Bill Crahen).
- Insertion/removal CDC (Tim Whitlatch)
- Hall D Vacuum-Thin Window Procedures (Tom Carstens)
- Solenoid Vacuum System Check Procedures
- Media:Hall D Solenoid Hi-Pot procedure.pdf
- Cryogenic target. (Chris Keith)