* [[Media:Hall D Vacuum-Thin window procedures.pdf]] (Tom Carstens)
 
* [[Media:Hall D Vacuum-Thin window procedures.pdf]] (Tom Carstens)
 
* Solenoid vacuum system check Procedures [[Media:Hall D Solenoid Vacuum check list.pdf]]
 
* Solenoid vacuum system check Procedures [[Media:Hall D Solenoid Vacuum check list.pdf]]
 +
* [[Media:Hall D Solenoid Hi-Pot procedure.pdf]]
 
* Cryogenic target. (Chris Keith)
 
* Cryogenic target. (Chris Keith)

Revision as of 16:29, 23 June 2014

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

DRAFTS