Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
(Setup for CPP-NPP Experiment)
 
(50 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
 
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
  
* Gas System Operation (Scot Spiegel/ Dave Butler)
 
* Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).
 
* Insertion/removal CDC (Tim Whitlatch)
 
* Vacuum / damage to radiators/convertes (Tom Carstens)
 
* Thin windows / Alcove and near photon beam dump (Tom Carstens)
 
* Magnet power supplies. Accelerator OSP?
 
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=32776 Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=32776 Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=36947  Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=36947  Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)]
* Solenoid, several procedures. Need to get a list of proceedures
 
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=19709 Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=19709 Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)]
* Cryogenic target. Chris Keith will lead the OSP effort
+
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=22021 Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)]
 +
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=21781 Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)]
 +
** Full list of procedures for the solenoid can be found under [[Solenoid Expert | Solenoid Expert Documentation]]
 +
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=130467 Operation of Muon MWPCs for CPP (ENP-22-130467-OSP)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791  Training for Work in the FCAL Dark Room (D00000-01-06-P006)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791  Training for Work in the FCAL Dark Room (D00000-01-06-P006)]
 +
* [https://misportal.jlab.org/jlabDocs/document.seam?id=82403 CDC installation procedure (D00000-00-00-P001)]
 +
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81785 Testing and Installation of the FDC in the Hall D Solenoid (D00000-00-00-P002)]
 +
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81084 Hall D Beam Line Vacuum Procedures (D00000-10-05-P001)]
 +
* [https://misportal.jlab.org/jlabDocs/document.seam?id=83368  Hall D FDC/CDC gas system oxygen purge procedure (D00000-10-02-P001)]
 +
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)]
 +
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85366 Operation of the Hall D Cryo Target (D00000-03-00-P001)]
 +
 +
=== Setup for CPP-NPP Experiment ===
 +
 +
* [https://halldweb.jlab.org/DocDB/0056/005638/001/CPP_Lead_Target_Change_Procedure_v1.pdf Change from Full to Empty Target]
 +
* [https://halldweb.jlab.org/DocDB/0056/005639/002/CPP_Lead_Absorber_Move_Procedure_v3.pdf Adjustment of Pb picture-frame absorber during commissioning]

Latest revision as of 16:54, 3 June 2022

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

Setup for CPP-NPP Experiment