Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
(Setup for CPP-NPP Experiment)
 
(8 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=21781 Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=21781 Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)]
 
** Full list of procedures for the solenoid can be found under [[Solenoid Expert | Solenoid Expert Documentation]]
 
** Full list of procedures for the solenoid can be found under [[Solenoid Expert | Solenoid Expert Documentation]]
 +
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=130467 Operation of Muon MWPCs for CPP (ENP-22-130467-OSP)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791  Training for Work in the FCAL Dark Room (D00000-01-06-P006)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791  Training for Work in the FCAL Dark Room (D00000-01-06-P006)]
 +
* [https://misportal.jlab.org/jlabDocs/document.seam?id=82403 CDC installation procedure (D00000-00-00-P001)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81785 Testing and Installation of the FDC in the Hall D Solenoid (D00000-00-00-P002)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81785 Testing and Installation of the FDC in the Hall D Solenoid (D00000-00-00-P002)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81084 Hall D Beam Line Vacuum Procedures (D00000-10-05-P001)]  
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81084 Hall D Beam Line Vacuum Procedures (D00000-10-05-P001)]  
 +
* [https://misportal.jlab.org/jlabDocs/document.seam?id=83368  Hall D FDC/CDC gas system oxygen purge procedure (D00000-10-02-P001)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)]  
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)]  
 +
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85366 Operation of the Hall D Cryo Target (D00000-03-00-P001)]
  
== DRAFT Procedures ==  
+
=== Setup for CPP-NPP Experiment ===
  
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure:
+
* [https://halldweb.jlab.org/DocDB/0056/005638/001/CPP_Lead_Target_Change_Procedure_v1.pdf Change from Full to Empty Target]
 
+
* [https://halldweb.jlab.org/DocDB/0056/005639/002/CPP_Lead_Absorber_Move_Procedure_v3.pdf Adjustment of Pb picture-frame absorber during commissioning]
* [[Media:Hall D CDC Installation procedure.pdf | Hall D CDC Installation Procedure ]] - signature approval underway (Tim Whitlatch)
+
* [[Media:Hall D Detector Gas system purge procedure.pdf | Hall D Detector Gas System Purge Procedure ]] - final draft  (Dave Butler)
+
* Cryogenic target. Will ''not'' be used during 2014 commissioning (Chris Keith)
+

Latest revision as of 16:54, 3 June 2022

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

Setup for CPP-NPP Experiment