Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
Line 7: Line 7:
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=21781 Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=21781 Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)]
 
** Full list of procedures for the solenoid can be found under [[Solenoid Expert | Solenoid Expert Documentation]]
 
** Full list of procedures for the solenoid can be found under [[Solenoid Expert | Solenoid Expert Documentation]]
 +
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=130467 Operation of Muon MWPCs for CPP (ENP-22-130467-OSP)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791  Training for Work in the FCAL Dark Room (D00000-01-06-P006)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791  Training for Work in the FCAL Dark Room (D00000-01-06-P006)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=82403 CDC installation procedure (D00000-00-00-P001)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=82403 CDC installation procedure (D00000-00-00-P001)]

Revision as of 09:00, 4 May 2022

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure: