Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
Line 6: Line 6:
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=22021 Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=22021 Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=21781 Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=21781 Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)]
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=33322
 
  
 
** Full list of procedures for the solenoid can be found under [[Solenoid Expert | Solenoid Expert Documentation]]
 
** Full list of procedures for the solenoid can be found under [[Solenoid Expert | Solenoid Expert Documentation]]

Revision as of 09:54, 25 March 2015

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

DRAFT Procedures

There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure: