Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
Line 11: Line 11:
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81785 Testing and Installation of the FDC in the Hall D Solenoid (D00000-00-00-P002)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81785 Testing and Installation of the FDC in the Hall D Solenoid (D00000-00-00-P002)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81084 Hall D Beam Line Vacuum Procedures (D00000-10-05-P001)]  
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=81084 Hall D Beam Line Vacuum Procedures (D00000-10-05-P001)]  
 +
* [https://misportal.jlab.org/jlabDocs/document.seam?id=83368  Hall D FDC/CDC gas system oxygen purge procedure (D00000-10-02-P001)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)]  
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)]  
  
Line 17: Line 18:
 
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure:
 
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure:
  
* [[Media:Hall D Detector Gas system purge procedure.pdf | Hall D Detector Gas System Purge Procedure ]] - final draft  (Dave Butler)
 
 
* Cryogenic target. Will ''not'' be used during 2014 commissioning (Chris Keith)
 
* Cryogenic target. Will ''not'' be used during 2014 commissioning (Chris Keith)

Revision as of 09:59, 27 March 2015

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

DRAFT Procedures

There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure:

  • Cryogenic target. Will not be used during 2014 commissioning (Chris Keith)