Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
Line 13: Line 13:
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=83368  Hall D FDC/CDC gas system oxygen purge procedure (D00000-10-02-P001)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=83368  Hall D FDC/CDC gas system oxygen purge procedure (D00000-10-02-P001)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)]  
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85132 Hall D Solenoid Normal Ramp up Procedure for Shift takers (D00000-04-02-P013)]  
 
+
* [https://misportal.jlab.org/jlabDocs/document.seam?id=85366 Operation of the Hall D Cryo Target (D00000-03-00-P001)]
== DRAFT Procedures ==
+
 
+
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure:
+
 
+
* Cryogenic target. Will ''not'' be used during 2014 commissioning (Chris Keith)
+

Revision as of 07:43, 10 April 2015

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure: