Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
Line 4: Line 4:
 
* Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).  
 
* Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).  
 
* Insertion/removal CDC (Tim Whitlatch)
 
* Insertion/removal CDC (Tim Whitlatch)
* Vacuum / damage to radiators/convertes (Tom Carstens)
+
* Vacuum / damage to radiators/convertes (Tom Carstens)[[Media:Hall D Vacuum-Thin window procedures.pdf]]
 
* Thin windows / Alcove and near photon beam dump (Tom Carstens)
 
* Thin windows / Alcove and near photon beam dump (Tom Carstens)
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=32776 Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=32776 Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)]

Revision as of 08:01, 20 June 2014

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure: