Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
Line 1: Line 1:
 
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
 
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
  
* Gas System Operation (Scot Spiegel/ Dave Butler)
 
* Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).
 
* Insertion/removal CDC (Tim Whitlatch)
 
* Vacuum / damage to radiators/convertes (Tom Carstens) [[Media:Hall D Vacuum-Thin window procedures.pdf]]
 
* Thin windows / Alcove and near photon beam dump (Tom Carstens)
 
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=32776 Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=32776 Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=36947  Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)]
 
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=36947  Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)]
 
* Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
 
* Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=19709 Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)]
 
* Cryogenic target. Chris Keith will lead the OSP effort
 
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791  Training for Work in the FCAL Dark Room (D00000-01-06-P006)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791  Training for Work in the FCAL Dark Room (D00000-01-06-P006)]
 +
 +
==Drafts==
 +
 +
* Gas System Operation (Scot Spiegel/ Dave Butler)
 +
* Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).
 +
* Insertion/removal CDC (Tim Whitlatch)
 +
* Vacuum / damage to radiators/converters (Tom Carstens) [[Media:Hall D Vacuum-Thin window procedures.pdf]]
 +
* Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
 +
* Cryogenic target. Chris Keith will lead the OSP effort

Revision as of 09:41, 23 June 2014

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

Drafts

  • Gas System Operation (Scot Spiegel/ Dave Butler)
  • Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).
  • Insertion/removal CDC (Tim Whitlatch)
  • Vacuum / damage to radiators/converters (Tom Carstens) Media:Hall D Vacuum-Thin window procedures.pdf
  • Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
  • Cryogenic target. Chris Keith will lead the OSP effort