Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
(DRAFTS)
(DRAFTS)
Line 13: Line 13:
 
* Vacuum / damage to radiators/converters (Tom Carstens) [[Media:Hall D Vacuum-Thin window procedures.pdf]]
 
* Vacuum / damage to radiators/converters (Tom Carstens) [[Media:Hall D Vacuum-Thin window procedures.pdf]]
 
* Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
 
* Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
* Cryogenic target. Chris Keith will lead the OSP effort
+
* Cryogenic target. (Chris Keith)

Revision as of 09:47, 23 June 2014

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

DRAFTS

  • Gas System Operation (Scot Spiegel/ Dave Butler)
  • Insertion/removal of FDC (Bill Crahen).
  • Insertion/removal CDC (Tim Whitlatch)
  • Vacuum / damage to radiators/converters (Tom Carstens) Media:Hall D Vacuum-Thin window procedures.pdf
  • Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
  • Cryogenic target. (Chris Keith)