Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
(DRAFTS)
(DRAFTS)
Line 11: Line 11:
 
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2512 Installation/Removal of FDC] (Bill Crahen).  
 
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2512 Installation/Removal of FDC] (Bill Crahen).  
 
* Insertion/removal CDC (Tim Whitlatch)
 
* Insertion/removal CDC (Tim Whitlatch)
* Vacuum / damage to radiators/converters (Tom Carstens) [[Media:Hall D Vacuum-Thin window procedures.pdf]]
+
* [[Media:Hall D Vacuum-Thin window procedures.pdf]] (Tom Carstens)
 
* Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
 
* Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
 
* Cryogenic target. (Chris Keith)
 
* Cryogenic target. (Chris Keith)

Revision as of 10:05, 23 June 2014

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

DRAFTS

  • Gas System Operation (Scot Spiegel/ Dave Butler)
  • Installation/Removal of FDC (Bill Crahen).
  • Insertion/removal CDC (Tim Whitlatch)
  • Media:Hall D Vacuum-Thin window procedures.pdf (Tom Carstens)
  • Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
  • Cryogenic target. (Chris Keith)