Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
(DRAFTS)
(DRAFTS)
Line 12: Line 12:
 
* Insertion/removal CDC (Tim Whitlatch)
 
* Insertion/removal CDC (Tim Whitlatch)
 
* [[Media:Hall D Vacuum-Thin window procedures.pdf]] (Tom Carstens)
 
* [[Media:Hall D Vacuum-Thin window procedures.pdf]] (Tom Carstens)
* Solenoid, Procedures contained in this folder M:\halld_engineering\Solenoid\controls\Solenoid Reference Documentation\July'14 Commissioning Draft Documents
+
* Solenoid vacuum system check Procedures [[Media:Hall D Solenoid Vacuum check list.pdf]]
 
* Cryogenic target. (Chris Keith)
 
* Cryogenic target. (Chris Keith)

Revision as of 16:17, 23 June 2014

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

DRAFTS