Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
(DRAFT Procedures)
(DRAFT Procedures)
Line 13: Line 13:
 
* [[Media:Hall D Detector Gas system purge procedure.pdf | Hall D Detector Gas System Purge Procedure ]] (Dave Butler)
 
* [[Media:Hall D Detector Gas system purge procedure.pdf | Hall D Detector Gas System Purge Procedure ]] (Dave Butler)
 
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2512 Installation/Removal of FDC] (Bill Crahen).  
 
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2512 Installation/Removal of FDC] (Bill Crahen).  
* Insertion/removal CDC (Tim Whitlatch)
+
* [[Media:Hall D CDC Installation procedure.pdf | Hall D CDC Installation Procedure ]]
 
* [[Media:Hall D Vacuum-Thin window procedures.pdf |Hall D Vacuum-Thin Window Procedures]] (Tom Carstens)
 
* [[Media:Hall D Vacuum-Thin window procedures.pdf |Hall D Vacuum-Thin Window Procedures]] (Tom Carstens)
 
* [[Media:Hall D Solenoid Vacuum check list.pdf | Solenoid Vacuum System Check Procedures]] (George Biallas)
 
* [[Media:Hall D Solenoid Vacuum check list.pdf | Solenoid Vacuum System Check Procedures]] (George Biallas)
 
* [[Media:Hall D Solenoid Hi-Pot procedure.pdf | Hall D Solenoid Hi-Pot Procedure ]] (Giles Brown)
 
* [[Media:Hall D Solenoid Hi-Pot procedure.pdf | Hall D Solenoid Hi-Pot Procedure ]] (Giles Brown)
 
* Cryogenic target. (Chris Keith)
 
* Cryogenic target. (Chris Keith)

Revision as of 08:45, 24 June 2014

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

DRAFT Procedures

There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure: