Collect Beam Data for Detector Checkout

From Hall D Ops Wiki
Revision as of 10:47, 2 July 2014 by Cmeyer (Talk | contribs) (Collect Beam Data for Detector Checkout)

Jump to: navigation, search

Main Page

Tune Electron Beam

Tune Photon Beam

One Week Pause in Running

Collect Beam Data for Detector Checkout

  1. Goal: Collect 5 days of beam data.
  2. Responsibility: HallD
  3. Conditions:
    • Tagger hall equipment in place and operating.
    • Beam 50nA CW
    • Radiator is 10-4.
    • Collimator hole is 3.5mm.
    • Solenoid on at 1200A
    • GlueX detectors are on.
    • Thin commissioning target at nominal position.
  4. Activities
    • Verify photon beam position and background levels.
    • Take data with the regular trigger for five days

Optimize Detector Settings

Drift Chamber Alignment

Collect More Regular Data