Difference between revisions of "Drift Chamber Alignment"

From Hall D Ops Wiki
Jump to: navigation, search
(Created page with "__TOC__ ==Main Page== ==Tune Electron Beam== ==Tune Photon Beam== ==One Week Pause in Running== ==[[Collect Beam Data for Detector...")
 
(Drift Chamber Alignment)
 
(6 intermediate revisions by 3 users not shown)
Line 1: Line 1:
__TOC__
 
==[[Fall 2014 Commissioning Plan|Main Page]]==
 
==[[Tune Electron Beam]]==
 
==[[Tune Photon Beam]]==
 
==[[One Week Pause in Running]]==
 
==[[Collect Beam Data for Detector Checkout]]==
 
==[[Optimize Detector Settings]]==
 
 
==Drift Chamber Alignment==
 
==Drift Chamber Alignment==
==[[Collect More Regular Data]]==
+
# Goal: Collect data with no or low field.
 +
# Responsibility: HallD
 +
* Expected Schedule:  See start dates in the run coordination meeting pages [https://halldweb1.jlab.org/wiki/index.php/Run_Coordination_Meetings#Meeting_General_Agenda here] and the general schedule [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan#Run_Plan here]: Duration of the Drift Chamber Alignment : 4 days
 +
# Conditions:
 +
#* Tagger hall equipment in place and operating.
 +
#* Beam 50nA CW
 +
#* Radiator is 0.2 - 1.0 10<sup>-4</sup> RL, depending on the FDC and trigger rates.
 +
#* Collimator hole is 5 mm.
 +
#* Solenoid 0-300A depending on backgrounds.
 +
#* GlueX detectors are on.
 +
#* Thin commissioning targets at various positions.
 +
# Activities
 +
#* If time permits, collect data with target in several positions.
 +
 
 +
[https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Back to main Fall14 commissioning page]

Latest revision as of 10:18, 20 October 2014

Drift Chamber Alignment

  1. Goal: Collect data with no or low field.
  2. Responsibility: HallD
  • Expected Schedule: See start dates in the run coordination meeting pages here and the general schedule here: Duration of the Drift Chamber Alignment : 4 days
  1. Conditions:
    • Tagger hall equipment in place and operating.
    • Beam 50nA CW
    • Radiator is 0.2 - 1.0 10-4 RL, depending on the FDC and trigger rates.
    • Collimator hole is 5 mm.
    • Solenoid 0-300A depending on backgrounds.
    • GlueX detectors are on.
    • Thin commissioning targets at various positions.
  2. Activities
    • If time permits, collect data with target in several positions.

Back to main Fall14 commissioning page