Difference between revisions of "Drift Chamber Alignment"

From Hall D Ops Wiki
Jump to: navigation, search
(Drift Chamber Alignment)
(Main Page)
Line 1: Line 1:
 
__TOC__
 
__TOC__
==[[Fall 2014 Commissioning Plan|Main Page]]==
+
==[[Fall 2014 Commissioning Plan#Drift Chamber Alignment|Main Page]]==
 +
 
 
==[[Tune Electron Beam]]==
 
==[[Tune Electron Beam]]==
 
==[[Tune Photon Beam]]==
 
==[[Tune Photon Beam]]==

Revision as of 12:12, 2 July 2014

Main Page

Tune Electron Beam

Tune Photon Beam

One Week Pause in Running

Collect Beam Data for Detector Checkout

Optimize Detector Settings

Drift Chamber Alignment

  1. Goal: Collect data with no or low field.
  2. Responsibility: HallD
  3. Conditions:
    • Tagger hall equipment in place and operating.
    • Beam 50nA CW
    • Radiator is 10-4.
    • Collimator hole is 3.5mm.
    • Solenoid 0-300A depending on backgrounds.
    • GlueX detectors are on.
    • Thin commissioning target at various positions.
  4. Activities
    • If time permits, collect data with target in several positions.

Collect More Regular Data