Drift Chamber Alignment

From Hall D Ops Wiki
Revision as of 10:12, 21 August 2014 by Deurpam (Talk | contribs)

Jump to: navigation, search

Drift Chamber Alignment

  1. Goal: Collect data with no or low field.
  2. Responsibility: HallD
  3. Conditions:
    • Tagger hall equipment in place and operating.
    • Beam 50nA CW
    • Radiator is 10-4.
    • Collimator hole is 3.5mm.
    • Solenoid 0-300A depending on backgrounds.
    • GlueX detectors are on.
    • Thin commissioning target at various positions.
  4. Activities
    • If time permits, collect data with target in several positions.

Back to main Fall14 commissioning page