Fall 2014 Commissioning Plan

From Hall D Ops Wiki
Revision as of 08:10, 2 July 2014 by Cmeyer (Talk | contribs) (Created page with "__TOC__ ==Tune Electron Beam== # Goal: Get electron beam to the dump in the tagger hall. # Responsibility: Accelerator, HallD, RadCon. # Conditions: #* Tagger hall equipment r...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Tune Electron Beam

  1. Goal: Get electron beam to the dump in the tagger hall.
  2. Responsibility: Accelerator, HallD, RadCon.
  3. Conditions:
    • Tagger hall equipment removed or shielded. This includes the microscope (TAGM) and the electronics.
    • Pulsed beam may be used.
    • No radiator installed.
    • Collimator blocks the photon beamline to Hall D.
  4. Activities:
    • Tune beam to the dump, check the beam specification.
    • Check radiation levels in the tagger hall.
    • Check for photons and radiation levels in the collimator cave.