=== Fall 2018 GlueX Run ===
+
The correct page is [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2018_Run here]
 
+
== Connect Information ==
+
 
+
To connect from the outside by phone please do the following
+
 
+
1.) To join via a Web Browser, go to the page [https://bluejeans.com/660743227] https://bluejeans.com/660743227.
+
 
+
2.) To join via Polycom room system go to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 660743227.
+
 
+
3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.
+
 
+
4.) The moderator code is <font color="red">8394</font>
+
 
+
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
+
 
+
Specific instructions for connecting from JLab's Hall D conference room:
+
 
+
*Turn polycon on if necessary (do it before turning the computer on)
+
*With the polycon, place a call at 199.48.152.152
+
*Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
+
*You may have to unmute the microphone: #*4
+
*Turn the computer on if needed
+
 
+
==Beam and Hall configuration  ==
+
 
+
* Beam energy expected:
+
** 11.640 GeV (same value as Fall 2016 to Spring 2018) until Nov. 15th.
+
** Then 10.3 GeV until Nov. 15th.
+
** Then 9.0 GeV until Dec. 19th.
+
* Solenoid on at 1350A. Any field changes should be avoided if possible.
+
* CW Beam current:
+
** Range: 1 nA-1.5 μA. 250 MHz frequency.
+
** Standard production running expected at 530 nA on 1.4&middot;10<sup>-4</sup> R.L. radiator (17 μm diamond).
+
** RSAD limit for most of the run, excluding high intensity tests: 600 nA on 1.6&middot;10<sup>-4</sup> R.L. radiator.
+
* FFB on or Position Slow Lock on (FFB doesn't operate below 50nA). 
+
* Radiators:
+
**Goniometer diamond radiators:
+
<!--*** J1a50 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;(50 μm - 4.1&middot;10<sup>-4</sup> R.L., 4&times;4 mm&sup2;) - old crystal - excellent rocking curve
+
***<font color="red"><b>JD70-100</b> (58 μm - 4.8&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - excellent rocking curve </font>-->
+
***<font color="red"><b>JD70-104 (17 μm - 1.4&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - wider rocking curve - Tested in Spring 2018: Yielded reasonable polarization.</b></font>
+
***JD70-105 (47 μm - 3.9&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - good rocking curve
+
**We also have one 40 μm Al radiator.
+
**Amorphous
+
*** 1.5 &micro;m Al (1.7&middot;10<sup>-5</sup> R.L.)
+
*** 10 &micro;m Al (11.2&middot;10<sup>-5</sup> R.L.)
+
*** 30 &micro;m Al (33.7&middot;10<sup>-5</sup> R.L.)
+
 
+
*Tagger quadrupole on (-4.2 A).
+
 
+
* Collimator hole: Both 5 mm diameter and 3.4 mm diameter. Default running: 5.0 mm, including with 17 μm diamond.
+
 
+
* Target: LH2 target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]
+
 
+
=General Information=
+
 
+
This document describes the run plan for the Hall D Fall 2018 run.
+
* Schedule for the run:
+
# Aug. 15th - 21st: Electron beam restoration
+
# Aug. 21st - Oct. 28th: GlueX-I run (E=11.64 GeV).
+
# Oct. 28th - Nov. 19th: DIRC and ComCal installation(? Solenoid will be ramped down but kept cool? )
+
# Nov. 20th - Dec. 09th: GlueX-II and Primex tests. Lower energy measurement checks. (E=10.3 GeV)
+
# Dec. 10th - Dec. 12th: Linac energy change.
+
# Dec. 13th - Dec. 19th: GlueX-II and Primex tests. Lower energy measurement checks. (E=9.0 GeV)
+
 
+
# Every Tuesdays: 12h of beam study. Every Thursdays, if necessary: 8h of RF recovery.
+
 
+
* Accelerator overall plan and priorities:
+
#Deliver physics beam to 4 halls.
+
 
+
* Experiment: GlueX [https://misportal.jlab.org/mis/physics/experiments/searchProposals.cfm?paramHall=D&paramExperimentEnergy=12GeV&paramExperimentStatusList=A,G E12-06-102] Production
+
* Planned tests (Accelerator, related to Hall D):
+
** Tests nA BPM and stripline BPM ?
+
** Test fast raster operation ?
+
* Planned tests (Hall D):
+
** At 11.6 GeV:
+
*** Align JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) (Hovanes) and take enough data to achieve ~1% statistic on rho polarimetry (less than a shift at 190 nA).
+
*** Fast raster beam characterization (R. Jones) ?  Will necessitate high-current (??h)
+
*** High-intensity GlueX L1 and DAQ tests (A. Somov, S. Furletov) ?
+
*** Muon chamber test ? (parasitic?) (E. Smith)
+
***TRD test (parasitic) (S. Furletov, L. Penchev)
+
** At 10.2 GeV:
+
***DIRC commissioning (J. Stevens)
+
***ComCal commissioning (A. Somov?)
+
***Strait track run (L. Penchev)
+
***ComCal test (no B-field, no DC on) (A. Somov?)
+
** At 9.0 GeV:
+
 
+
 
+
* Expected Staffing and responsibilities:
+
**The Run Coordinator oversees the commissioning:
+
*** Aug. 15th-Aug. 21st, 7 days: Alexandre Deur (accelerator restoration)
+
*** Aug. 22nd-Aug. 28th, 7 days: Alexandre Deur
+
*** Aug. 29th-Sept 4th, 7 days: Cristiano Fanelli
+
*** Sept. 5th-Sept. 11th, 7 days: Colin Gleason
+
*** Sept. 12th-Sept. 18th, 7 days: Alexander Austregesilo
+
*** Sept. 19th-Sept. 25th: <font color="red"> TBD </font>
+
*** Sept. 26th-Oct. 2nd, 7 days: Naomi Jarvis
+
*** Oct. 3rd-Oct. 9th, 7 days: Stuart Fegan
+
*** Oct. 10th-Oct. 16th: <font color="red"> TBD </font>
+
*** Oct. 17th-Oct. 23rd: <font color="red"> TBD </font>
+
*** Oct. 24th-Oct. 28th: <font color="red"> TBD </font>
+
*** Oct. 29th-Nov. 17th: Hall open for installation
+
*** Nov. 14th-Nov. 20th, 7 days: Alexandre Deur
+
*** Nov. 21st-Nov. 27th, 7 days: Richard Jones
+
*** Nov. 28st-Dec. 4th, 7 days: Wenliang Li
+
*** Dec. 5th-Dec. 11th: <font color="red"> TBD </font>
+
*** Dec. 12th-Dec. 20th: Jeorg Reinhold
+
 
+
 
+
**The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (T. Carstens) verify that the proper safety rules are followed. PDLs are:
+
***Benedikt Zihlmann.
+
**The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.
+
**Shifts: 2 persons per shift.
+
* Coordination Activities:
+
** The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.
+
** Daily run meetings broadcasted on Bluejeans will occur at 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting.
+
* Useful links:
+
**Accelerator schedule
+
***[https://www.jlab.org/exp_prog/experiment_schedule/2018/20180511.0_ExpSch.pdf long term calendar]
+
***[https://accweb.acc.jlab.org/calendar/  Scheduled Accelerator Down (SAD)/Maintenance Calendar]
+
***[http://accboard.acc.jlab.org/ http://accboard.acc.jlab.org/]
+
**Links to previous runplans
+
***[https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan 10.5 GeV Fall 2014]
+
***[https://halldweb.jlab.org/hdops/wiki/index.php/Spring_2015_6GeV_Commissioning_Plan  6 GeV spring 2015]
+
***[https://halldweb.jlab.org/wiki/index.php/Fall_2015_Commissioning_Plan 12.05 GeV Fall 2015]
+
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2016_Run 12.05 GeV Spring 2016]
+
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Fall_2016_Run 11.64 GeV Fall 2016]
+
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2017_Run 11.64 GeV Spring 2017]
+
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2017_Spring2018_Run 11.64 GeV Fall 2017 and Spring 2018 runs]
+
** Links to beam parameters/radiation level monitoring:
+
***[https://www.jlab.org/accel/RadCon/opsgraphs/8h/halld_8h.pdf Last 8-hours plots showing 1-minute, 10-minute, and hourly averages]
+
***[https://www.jlab.org/accel/RadCon/opsgraphs/24h/halld_24h.pdf Same but Last 24-hours]
+
***[https://www.jlab.org/accel/RadCon/opsgraphs/72h/halld_72h.pdf Same but Last 72-hours]
+
***Week, month, and quarter (3 months) plots also exist, with similar web addresses.
+
*** A map of the radiation monitors [[File:Location_detect2.jpg | 100px]]
+
 
+
 
+
== Runplan ==
+
#Verify electron beam quality and establish photon beam (assume 1 day).
+
#*<b>Ion Chambers trip threshold must be set using Al. radiators</b>
+
#*Tune electron beam with radiator retracted 
+
#**<b>Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position. </b>
+
#***Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)
+
#****RAD102_P1 <span style="color:#ff00ff">~ 10 mrad/hr</span> (tagger area, gammas, between tagger and dump)
+
#****RAD102_P2 <span style="color:#ff00ff">~ 0.1 mrad/hr</span> (tagger area, gammas, on the goniometer).
+
#****RAD102_P3 <span style="color:#ff00ff">~ 0.3 mrem/hr</span> (tagger area, neutrons, near electronics racks) 
+
#****RAD508_P1 <span style="color:#ff00ff">< 0.1 mrad/hr</span> (collimator cave, gammas).
+
#****RAD508_P2 <span style="color:#ff00ff">~ 0. mrad/hr</span> (Hall. Neutrons).
+
#**<b>Hall D tagger  CARMS, Ion Chamber and BLM threshold for beam trips should not be changed without approval of Hall D leader.</b>
+
<!--#*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A/B/C needs to be running</font>-->
+
#*Establish good photon beam
+
#* Make sure tagger quadrupole is on and at -4.2 A. (It can be turned on only once the Hall is n power/beam permit.)
+
#**Insert 2*10<sup>-5</sup> RL radiator. <b><font color="red">Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved</font></b>
+
#*** Typical levels are (for 2×10<sup>-5</sup> radiator, electron beam current 50 nA)
+
#****RAD102_P1= <span style="color:#ff00ff">35  mrad/hr</span> (tagger area, gammas, between tagger and dump)
+
#****RAD102_P2= <span style="color:#ff00ff"> 0.5  mrad/hr</span> (tagger area, gammas, on the goniometer)
+
#****RAD102_P3= <span style="color:#ff00ff"> ~2 mrem/hr</span> (tagger area, neutrons, near electronics racks)
+
#****RAD508_P1= <span style="color:#ff00ff">~10 mrad/hr</span> (collimator cave, gammas).
+
#****RAD508_P2 <span style="color:#ff00ff">< ~ 0. mrad/hr</span> (Hall. Neutrons).
+
#*Verify beam position and envelope.
+
#**Ask MCC for 5C11 and 5C11B HARP. Then do our radiator HARP scan, [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Radiator_Harp_Scan see instruction]. If it looks good, proceed to next step. Otherwise, inform MCC.
+
#**Insert profiler (no need for masking FSD when an object is inserted in the photon line), run with 10×10<sup>-4</sup> radiator and 50 nA. Beam on the profiler should be at x=0.0±0.5cm; y=0.0±0.5cm. If not, inform MCC.
+
#*Radiation level study (1h):
+
#**Run 5 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA. Repeat at 100 nA and 200 nA
+
#**Run 5 min with the 10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
+
#**Run 3 min with the 3*10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
+
#*Microscope yield study (row-by-row scan).  (Richard/Jim McIntyre, 1h)
+
#**Call Richard Jones <!-- 860-377-5224--> 20 min before the start of this task. Call Alex Somov to set-up the PS trigger.
+
#**Insert 5mm collimator.
+
#**[https://logbooks.jlab.org/entry/3497901 Procedure to follow]
+
#**Any type of beam quality will do.
+
#**10<sup>-4</sup> radiator, 10<sup>-3</sup> convertor, 80 nA beam current.
+
#* Active Collimator calibration. (20 + 20 mins). Call Hovanes.
+
#**re-Insert the 10<sup>-4</sup> radiator (Call MCC). Use about 100 nA beam current. This will provide the Act. Col. nominal positions for its high gain values.
+
#**Determine maximum photon beam transmission by doing 2D scans using the collimator x/y motions (Hovanes. 1h)
+
#** Repeat procedure with 2*10<sup>-5</sup> radiator (Call MCC) and 50 nA beam current. This will provide the Act. Col. nominal positions for its low gain values.
+
#**Record on the white board what is the beam position on 5C11b and  Active Collimator for optimal photon transmission, both for low and high Act. Col. gain.
+
#**Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.
+
#Detector and beamline checkout.
+
#*Reestablish L1 trigger Alex. Somov. 3h).
+
#*Reestablish DAQ (Sergei, 2h).
+
#*General detector calibration (Sean Dobbs. <!--703-887-1776--> 8h). Use 10<sup>-4</sup> radiator.
+
#**Run 15 min in Long Mode.
+
#Align 17 μm diamond (JD70-104) for the 4 polarization configurations (Hovanes. 16h).
+
#Gluex data production
+
#*Physics production data with diamonds and 5 mm hole. Ratio of para./transverse/45<sup>o</sup>/135<sup>o</sup> data:25/25/25/25. 2h runs <b>and no more, as it may be hard to correct for calibration drifts</b>.  Switch polarization every run. Time to switch: 10min. DAQ start run overhead: 3min.
+
#*Log in run information in the shift summary (make a run list). For each production run, log useful comments on DAQ comment window, see [https://halldweb.jlab.org/hdops/wiki/index.php/Best_Practices/FAQ]
+
#*Tagger quadrupole on
+
#*Harp scans once a day: 15 min.
+
#*If commissioning and analysis are successful, once a day (?), a beam envelope measurement by rastering on Act. Col. ??min
+
#*Empty target run every 3 week (2h: 1<sup>-</sup> h to empty/fill back the target, 1h running). Standard production current.
+
#*Long mode 10 min run. Once a week (20 min).
+
#*Amorphous run. Every set of 4 diam. orientation runs. 1h Standard production current. Time to switch from pol. to unpol.: 10min.  time to switch from unpol. to pol.: 30min.
+
#Align  JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) for 2 polarization configurations (Hovanes 12h) and take enough data to achieve ~1% statistic on rho polarimetry (8h at 190 nA). Decide if it is better to run on this diamond.
+
#Two TAC runs at the beginning and end of 11.6 GeV run. (Hovanes, Alex Somov 8/h run.)
+
#Luminosity scans (J. Stevens)?
+
#Some physics production data with thin diamond and 3.4 mm hole ?
+
#Parasitic muon chamber run?
+
#Parasitic TRD run
+
#During 10.2 GeV run:
+
#*DIRC commissionning (J. Stevens)
+
#* ComCal commissioning (A. Somov)
+
#* Gather data to be compared to CLAS results. (J. Stevens?) Intersperesed with above commissioning
+
#* Luminosity scans? (J. Stevens?)
+
#*Straight track run (16h end of 10.2 GeV period) (Lubomir)/ComCal test (A. Somov?)
+
#**Ramp down solenoid magnet (8h)
+
#**Take straight track run data (Lubomir)
+
#**ComCal test (no B-field, no DC on)
+
#*Parasitic muon chamber run?
+
#*Parasitic TRD run
+
#During 9.0 GeV run:
+
#*DIRC commissionning (J. Stevens)
+
#* ComCal commissioning (A. Somov)
+
#* Gather data to be compared to CLAS results. (J. Stevens?) Intersperesed with above commissioning
+
#* Luminosity scans? (J. Stevens?)
+
 
+
== Hall D situation room (current run plan) ==
+
 
+
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]
+
 
+
== Runplan time charts==
+
 
+
'''Fall 2018 time chart''':
+
<!--[[File:spring18_week1.jpg|70px|thumb|none]]
+
Spring 2018 commissioning/run time chart. Week 1.<br/>
+
The horizontal scale is the time during which beam is available (in other words, it would be the real time with 100% of beam efficiency).<br/>
+
The task time estimates given on the plot have 100% contingency.
+
[[File:spring18_week2.jpg|70px|thumb|none|  ]]
+
Run time chart. Week 2. -->
+
 
+
----
+
 
+
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York View Runplan google calendar]
+
* [http://calendar.google.com Edit Runplan google calendar]
+
* [https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
+
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Spreadsheet: number of triggers]
+
 
+
==Accelerator status ==
+
#* [https://cebaf.jlab.org/files/ops/accboard/ Link to accelerator short term schedule]
+
 
+
==Hot Checkout ==
+
# [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  <span style="color:green"> 5% ready </span>; <span style="color:#BABC3A">3% checked </span>; <span style="color:red">92% not ready  </span>
+
 
+
==Readiness for Fall 17-Spring18 run ==
+
<!--(This section is commented out for clarity) -->
+
 
+
 
+
 
+
=== Run Planning Meetings Fall 2018 Running ===
+
*[[Run Planning Meetings Fall 2018 Running]]
+
 
+
=== Run Summaries ===
+

Latest revision as of 13:22, 29 August 2018

The correct page is here