=== Fall 2018 GlueX Run ===
+
The correct page is [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2018_Run here]
 
+
== Connect Information ==
+
 
+
To connect from the outside by phone please do the following
+
 
+
1.) To join via a Web Browser, go to the page [https://bluejeans.com/660743227] https://bluejeans.com/660743227.
+
 
+
2.) To join via Polycom room system go to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 660743227.
+
 
+
3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.
+
 
+
4.) The moderator code is <font color="red">8394</font>
+
 
+
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
+
 
+
Specific instructions for connecting from JLab's Hall D conference room:
+
 
+
*Turn polycon on if necessary (do it before turning the computer on)
+
*With the polycon, place a call at 199.48.152.152
+
*Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
+
*You may have to unmute the microphone: #*4
+
*Turn the computer on if needed
+
 
+
==Beam and Hall configuration  ==
+
 
+
* Beam energy expected:
+
** 11.640 GeV (same value as Fall 2016 to Spring 2018) until Nov. 15th.
+
** Then 10.3 GeV until Dec. 10th.
+
** Then 9.0 GeV until Dec. 19th.
+
* Solenoid on at <font color="blue"><b>1350A for the 3 energies.</b></font> ComCal commissioning with solenoid off. Any other field changes should be avoided if possible.
+
* CW Beam current:
+
** Range: 1 nA-1.5 μA. 250 MHz frequency.
+
** Standard production running expected at 530 nA on 1.4&middot;10<sup>-4</sup> R.L. radiator (17 μm diamond).
+
** RSAD limit for most of the run, excluding high intensity tests: 600 nA on 1.6&middot;10<sup>-4</sup> R.L. radiator.
+
* FFB on or Position Slow Lock on (FFB doesn't operate below 50nA). 
+
* Radiators:
+
**Goniometer radiators:
+
<!--*** J1a50 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;(50 μm - 4.1&middot;10<sup>-4</sup> R.L., 4&times;4 mm&sup2;) - old crystal - excellent rocking curve
+
***<font color="blue"><b>JD70-100</b> (58 μm - 4.8&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - excellent rocking curve </font>-->
+
***<font color="blue"><b>Diamond JD70-104 (17 μm - 1.4&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) </b></font> - wider rocking curve - Tested in Spring 2018: Yielded reasonable polarization.
+
***Diamond JD70-105 (47 μm - 3.9&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - good rocking curve
+
**40 μm Al radiator (44.9&middot;10<sup>-5</sup> R.L.)
+
**V-wire (for TAC run).
+
**Amorphous
+
*** 1.5 &micro;m Al (1.7&middot;10<sup>-5</sup> R.L.)
+
*** 10 &micro;m Al (11.2&middot;10<sup>-5</sup> R.L.)
+
*** 30 &micro;m Al (33.7&middot;10<sup>-5</sup> R.L.)
+
 
+
*Tagger quadrupole on (-4.2 A).
+
 
+
* Collimator hole: Both 5 mm diameter and 3.4 mm diameter. <font color="blue"><b>Default running: 5.0 mm, including with 17 μm diamond.</b></font>
+
 
+
* Targets:
+
**LH2 target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]
+
**<font color="red">Solid targets ? TBD </font>
+
 
+
* Miscellaneous:
+
** DIRC will be installed
+
** Transition Radiation Detector in the Hall
+
** Muon chamber will not be in the hall (location interferes with DIRC)
+
 
+
=General Information=
+
 
+
This document describes the run plan for the Hall D Fall 2018 run.
+
* Schedule for the run:
+
# Aug. 15th - 21st: Electron beam restoration
+
# Aug. 21st - Oct. 28th: GlueX-I run (E=11.64 GeV).
+
# Oct. 28th - Nov. 19th: DIRC and ComCal installation (Solenoid will be ramped down but kept cool? )
+
# Nov. 20th - Dec. 09th: GlueX-II and Primex tests. Lower energy measurement checks. (E=10.3 GeV)
+
# Dec. 10th - Dec. 12th: Linac energy change.
+
# Dec. 13th - Dec. 19th: GlueX-II and Primex tests. Lower energy measurement checks. (E=9.0 GeV)
+
 
+
# Every Tuesdays: 12h of beam study. Every Thursdays, if necessary: 8h of RF recovery.
+
 
+
* Accelerator overall plan and priorities:
+
#Deliver physics beam to 4 halls.
+
 
+
* Experiment: GlueX [https://misportal.jlab.org/mis/physics/experiments/searchProposals.cfm?paramHall=D&paramExperimentEnergy=12GeV&paramExperimentStatusList=A,G E12-06-102] Production
+
* Planned tests (Accelerator, related to Hall D):
+
** <font color="red">Further tests of nA BPM and stripline BPM ?</font>
+
** Test fast raster beam envelope measurement with larger x-rastering. <font color="red">Need details plan, including time estimate</font>
+
* Planned tests (Hall D):
+
** At 11.6 GeV:
+
*** Align JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) (Hovanes) and take enough data to achieve ~1% statistic on rho polarimetry (less than a shift at 190 nA).
+
*** Test fast raster beam envelope measurement with larger x-rastering. (R. Jones) <font color="red">Need details plan, including time estimate</font>
+
*** High-intensity GlueX L1 and DAQ tests (A. Somov, S. Furletov)
+
*** ToF trigger test for Muon chamber. With solid target. (D. Lawrence/E. Smith) <font color="red">Need details plan, including time estimate</font>
+
***TRD test (parasitic) (S. Furletov, L. Penchev)
+
** At 10.2 and 9 GeV:
+
***DIRC commissioning (J. Stevens) <font color="red">Need details plan, including time estimate</font>
+
***<font color="red"> ComCal commissioning with B-Field (A. Somov?) Need details plan, including time estimate</font>
+
***Strait track run (L. Penchev)
+
***ComCal test (no B-field, no DC on) (A. Somov?) <font color="red">Need details plan, including time estimate</font>
+
***High-intensity GlueX L1 and DAQ tests (A. Somov, S. Furletov)
+
 
+
* Expected Staffing and responsibilities:
+
**The Run Coordinator oversees the commissioning:
+
*** Aug. 15th-Aug. 21st, 7 days: Alexandre Deur (accelerator restoration)
+
*** Aug. 22nd-Aug. 28th, 7 days: Alexandre Deur
+
*** Aug. 29th-Sept 4th, 7 days: Cristiano Fanelli
+
*** Sept. 5th-Sept. 11th, 7 days: Colin Gleason
+
*** Sept. 12th-Sept. 18th, 7 days: Alexander Austregesilo
+
*** Sept. 19th-Sept. 25th: <font color="red"> TBD </font>
+
*** Sept. 26th-Oct. 2nd, 7 days: Naomi Jarvis
+
*** Oct. 3rd-Oct. 9th, 7 days: Stuart Fegan
+
*** Oct. 10th-Oct. 16th: <font color="red"> TBD </font>
+
*** Oct. 17th-Oct. 23rd: <font color="red"> TBD </font>
+
*** Oct. 24th-Oct. 28th: <font color="red"> TBD </font>
+
*** Oct. 29th-Nov. 17th: Hall open for installation
+
*** Nov. 14th-Nov. 20th, 7 days: Alexandre Deur
+
*** Nov. 21st-Nov. 27th, 7 days: Richard Jones
+
*** Nov. 28st-Dec. 4th, 7 days: Wenliang Li
+
*** Dec. 5th-Dec. 11th: <font color="red"> TBD </font>
+
*** Dec. 12th-Dec. 20th: Jeorg Reinhold
+
**The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDLs are:
+
***Benedikt Zihlmann.
+
**The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.
+
**Shifts: 2 persons per shift.
+
* Coordination Activities:
+
** The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.
+
** Daily run meetings broadcasted on Bluejeans will occur at 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting.
+
* Useful links:
+
**Accelerator schedule
+
***[https://www.jlab.org/exp_prog/experiment_schedule/2018/20180511.0_ExpSch.pdf long term calendar]
+
***[https://accweb.acc.jlab.org/calendar/  Scheduled Accelerator Down (SAD)/Maintenance Calendar]
+
***[http://accboard.acc.jlab.org/ http://accboard.acc.jlab.org/]
+
**Links to previous runplans
+
***[https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan 10.5 GeV Fall 2014]
+
***[https://halldweb.jlab.org/hdops/wiki/index.php/Spring_2015_6GeV_Commissioning_Plan  6 GeV spring 2015]
+
***[https://halldweb.jlab.org/wiki/index.php/Fall_2015_Commissioning_Plan 12.05 GeV Fall 2015]
+
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2016_Run 12.05 GeV Spring 2016]
+
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Fall_2016_Run 11.64 GeV Fall 2016]
+
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2017_Run 11.64 GeV Spring 2017]
+
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2017_Spring2018_Run 11.64 GeV Fall 2017 and Spring 2018 runs]
+
** Links to beam parameters/radiation level monitoring:
+
***[https://www.jlab.org/accel/RadCon/opsgraphs/8h/halld_8h.pdf Last 8-hours plots showing 1-minute, 10-minute, and hourly averages]
+
***[https://www.jlab.org/accel/RadCon/opsgraphs/24h/halld_24h.pdf Same but Last 24-hours]
+
***[https://www.jlab.org/accel/RadCon/opsgraphs/72h/halld_72h.pdf Same but Last 72-hours]
+
***Week, month, and quarter (3 months) plots also exist, with similar web addresses.
+
*** A map of the radiation monitors [[File:Location_detect2.jpg | 100px]]
+