===Fall 2018 GlueX Run===
 
  
==Connect Information==
 
 
To connect from the outside by phone please do the following
 
 
1.) To join via a Web Browser, go to the page [https://bluejeans.com/660743227] https://bluejeans.com/660743227.
 
 
2.) To join via Polycom room system go to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 660743227.
 
 
3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.
 
 
4.) The moderator code is <font color="red">8394</font>
 
 
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
 
 
Specific instructions for connecting from JLab's Hall D conference room:
 
 
*Turn polycon on if necessary (do it before turning the computer on)
 
*With the polycon, place a call at 199.48.152.152
 
*Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
 
*You may have to unmute the microphone: #*4
 
*Turn the computer on if needed
 
 
==Beam and Hall configuration==
 
 
* Beam energy expected:
 
** 11.640 GeV (same value as Fall 2016 to Spring 2018) until Nov. 15th.
 
** Then 10.3 GeV until Dec. 10th.
 
** Then 9.0 GeV until Dec. 19th.
 
* Solenoid on at <font color="blue"><b>1350A for the 3 energies.</b></font> ComCal commissioning with solenoid off. Any other field changes should be avoided if possible.
 
* CW Beam current:
 
** Range: 1 nA-1.5 μA. 250 MHz frequency.
 
** Chopper slit shared with Hall A (Hall A to start run on Sept. 12th)
 
** Standard production running expected at 530 nA on 1.4&middot;10<sup>-4</sup> R.L. radiator (17 μm diamond).
 
** RSAD limit for most of the run, excluding high intensity tests: 600 nA on 1.6&middot;10<sup>-4</sup> R.L. radiator.
 
* FFB on or Position Slow Lock on (FFB doesn't operate below 50nA). 
 
* Radiators:
 
**Goniometer radiators:
 
<!--*** J1a50 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;(50 μm - 4.1&middot;10<sup>-4</sup> R.L., 4&times;4 mm&sup2;) - old crystal - excellent rocking curve
 
***<font color="blue"><b>JD70-100</b> (58 μm - 4.8&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - excellent rocking curve </font>-->
 
***<font color="blue"><b>Diamond JD70-104 (17 μm - 1.4&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) </b></font> - wider rocking curve - Tested in Spring 2018: Yielded reasonable polarization.
 
***Diamond JD70-105 (47 μm - 3.9&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - good rocking curve
 
**40 μm Al radiator (44.9&middot;10<sup>-5</sup> R.L.)
 
**V-wire (for TAC run).
 
**Amorphous
 
*** 1.5 &micro;m Al (1.7&middot;10<sup>-5</sup> R.L.)
 
*** 10 &micro;m Al (11.2&middot;10<sup>-5</sup> R.L.)
 
*** 30 &micro;m Al (33.7&middot;10<sup>-5</sup> R.L.)
 
 
*Tagger quadrupole on (-4.2 A).
 
 
* Collimator hole: Both 5 mm diameter and 3.4 mm diameter. <font color="blue"><b>Default running: 5.0 mm, including with 17 μm diamond.</b></font>
 
 
* Targets:
 
**LH2 target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]
 
**<font color="red">Solid targets for 10.3 and 9 GeV running ? TBD </font>
 
 
* Miscellaneous:
 
** DIRC will be installed
 
** Transition Radiation Detector in the Hall
 
** Muon chamber will not be in the hall (location interferes with DIRC)
 
 
==General Information==
 
 
This document describes the run plan for the Hall D Fall 2018 run.
 
* Schedule for the run:
 
# Aug. 15th - 21st: Electron beam restoration
 
# Aug. 21st - Oct. 28th: GlueX-I run (E=11.64 GeV).
 
# Oct. 28th - Nov. 19th: DIRC and ComCal installation (Solenoid will be ramped down but kept cold)
 
# Nov. 20th - Dec. 09th: GlueX-II and Primex tests. Lower energy measurement checks. (E=10.3 GeV)
 
# Dec. 10th - Dec. 12th: Linac energy change.
 
# Dec. 13th - Dec. 19th: GlueX-II and Primex tests. Lower energy measurement checks. (E=9.0 GeV)
 
 
# Every Mondays: 12h of beam study. Every Tuesdays, if necessary: 8h of RF recovery.
 
 
* Accelerator overall plan and priorities:
 
#Deliver physics beam to 4 halls. (Hall A to starts later, on Sept 12th)
 
 
* Experiment: GlueX [https://misportal.jlab.org/mis/physics/experiments/searchProposals.cfm?paramHall=D&paramExperimentEnergy=12GeV&paramExperimentStatusList=A,G E12-06-102] Production
 
* Planned tests (Accelerator, related to Hall D):
 
** <font color="red">Further tests of nA BPM and stripline BPM ?</font>
 
** Test fast raster beam envelope measurement with larger x-rastering. <font color="red">Need detailed plan, including time estimate</font>
 
* Planned tests (Hall D):
 
** At 11.6 GeV:
 
*** Align JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) (Hovanes) and take enough data to achieve ~1% statistic on rho polarimetry (less than a shift at 190 nA).
 
*** Test fast raster beam envelope measurement with larger x-rastering. (R. Jones) <font color="red">Need detailed plan, including time estimate</font>
 
*** High-intensity GlueX L1 and DAQ tests (A. Somov, S. Furletov)
 
*** ToF trigger test for Muon chamber. With solid target. (D. Lawrence/E. Smith) <font color="red">Need detailed plan, including time estimate</font>
 
***TRD test (parasitic) (S. Furletov, L. Penchev)
 
** At 10.2 and 9 GeV:
 
***DIRC commissioning (J. Stevens) <font color="red">Need detailed plan, including time estimate</font>
 
***<font color="red"> ComCal commissioning with B-Field (A. Somov?) Need detailed plan, including time estimate</font>
 
***Strait track run (L. Penchev)
 
***ComCal test (no B-field, no DC on) (A. Somov?) <font color="red">Need detailed plan, including time estimate</font>
 
***High-intensity GlueX L1 and DAQ tests (A. Somov, S. Furletov)
 
 
* Expected Staffing and responsibilities:
 
**The Run Coordinator oversees the commissioning:
 
*** Aug. 15th-Aug. 21st, 7 days: Alexandre Deur (accelerator restoration)
 
*** Aug. 22nd-Aug. 28th, 7 days: Alexandre Deur
 
*** Aug. 29th-Sept 4th, 7 days: Cristiano Fanelli
 
*** Sept. 5th-Sept. 11th, 7 days: Colin Gleason
 
*** Sept. 12th-Sept. 18th, 7 days: Alexander Austregesilo
 
*** Sept. 19th-Sept. 25th, 7 days: Thomas Britton
 
*** Sept. 26th-Oct. 2nd, 7 days: Naomi Jarvis
 
*** Oct. 3rd-Oct. 9th, 7 days: Stuart Fegan
 
*** Oct. 10th-Oct. 16th, 7 days: <font color="red"> TBD </font>
 
*** Oct. 17th-Oct. 23rd, 7 days: Ben. Zihlmann (Deputy PDL: A. Deur)
 
*** Oct. 24th-Oct. 28th, 7 days: Daniel Lersch
 
*** Oct. 29th-Nov. 17th, 7 days: Hall open for installation
 
*** Nov. 14th-Nov. 20th, 7 days: Alexandre Deur
 
*** Nov. 21st-Nov. 27th, 7 days: Richard Jones
 
*** Nov. 28st-Dec. 4th, 7 days: Wenliang Li
 
*** Dec. 5th-Dec. 11th, 7 days: Liping Gan
 
*** Dec. 12th-Dec. 20th, 8 days: Jeorg Reinhold
 
**The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDLs are:
 
***Benedikt Zihlmann (except during Oct. 17th-Oct. 23rd: A. Deur to be PDL).
 
**The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.
 
**Shifts: 2 persons per shift.
 
* Coordination Activities:
 
** The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.
 
** Daily run meetings broadcasted on Bluejeans will occur at 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting.
 
* Useful links:
 
**Accelerator schedule
 
***[https://www.jlab.org/exp_prog/experiment_schedule/2018/20180511.0_ExpSch.pdf long term calendar]
 
***[https://accweb.acc.jlab.org/calendar/  Scheduled Accelerator Down (SAD)/Maintenance Calendar]
 
***[http://accboard.acc.jlab.org/ http://accboard.acc.jlab.org/]
 
**Links to previous runplans
 
***[https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan 10.5 GeV Fall 2014]
 
***[https://halldweb.jlab.org/hdops/wiki/index.php/Spring_2015_6GeV_Commissioning_Plan  6 GeV spring 2015]
 
***[https://halldweb.jlab.org/wiki/index.php/Fall_2015_Commissioning_Plan 12.05 GeV Fall 2015]
 
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2016_Run 12.05 GeV Spring 2016]
 
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Fall_2016_Run 11.64 GeV Fall 2016]
 
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2017_Run 11.64 GeV Spring 2017]
 
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2017_Spring2018_Run 11.64 GeV Fall 2017 and Spring 2018 runs]
 
** Links to beam parameters/radiation level monitoring:
 
***[https://www.jlab.org/accel/RadCon/opsgraphs/8h/halld_8h.pdf Last 8-hours plots showing 1-minute, 10-minute, and hourly averages]
 
***[https://www.jlab.org/accel/RadCon/opsgraphs/24h/halld_24h.pdf Same but Last 24-hours]
 
***[https://www.jlab.org/accel/RadCon/opsgraphs/72h/halld_72h.pdf Same but Last 72-hours]
 
***Week, month, and quarter (3 months) plots also exist, with similar web addresses.
 
*** A map of the radiation monitors [[File:Location_detect2.jpg | 100px]]
 
 
== Runplan ==
 
 
#Verify electron beam quality and establish photon beam (assume 1 day).
 
#*<b>Ion Chambers trip threshold must be set using Al. radiators</b>
 
#*Tune electron beam with radiator retracted 
 
#**<b>Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position. </b>
 
#***Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)
 
#****RAD102_P1 <span style="color:#ff00ff">~ 10 mrad/hr</span> (tagger area, gammas, between tagger and dump)
 
#****RAD102_P2 <span style="color:#ff00ff">< 0.1 mrad/hr</span> (tagger area, gammas, on the ground below the goniometer).
 
#****RAD102_P3 <span style="color:#ff00ff">~ 0.3 mrem/hr</span> (tagger area, neutrons, near electronics racks) 
 
#****RAD508_P1 <span style="color:#ff00ff">< 0.1 mrad/hr</span> (collimator cave, gammas).
 
#****RAD508_P2 <span style="color:#ff00ff">~ 0. mrad/hr</span> (Hall. Neutrons).
 
<!--#**<b>Hall D tagger  CARMS, Ion Chamber and BLM threshold for beam trips should not be changed without approval of Hall D leader.</b>-->
 
<!--#*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A/B/C needs to be running</font>-->
 
#*Establish good photon beam
 
#* Make sure tagger quadrupole is on and at -4.2 A. (It can be turned on only once the Hall is n power/beam permit.)
 
#**Insert 2*10<sup>-5</sup> RL radiator. <b><font color="red">Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved</font></b>
 
#*** Typical levels are (for 2×10<sup>-5</sup> radiator, electron beam current 50 nA)
 
#****RAD102_P1= <span style="color:#ff00ff">35  mrad/hr</span> (tagger area, gammas, between tagger and dump)
 
#****RAD102_P2= <span style="color:#ff00ff">< 0.5  mrad/hr</span> (tagger area, gammas, on the ground below the goniometer)
 
#****RAD102_P3= <span style="color:#ff00ff"> ~2 mrem/hr</span> (tagger area, neutrons, near electronics racks)
 
#****RAD508_P1= <span style="color:#ff00ff">~10 mrad/hr</span> (collimator cave, gammas).
 
#****RAD508_P2 <span style="color:#ff00ff">< ~ 0. mrad/hr</span> (Hall. Neutrons).
 
#*Verify beam position and envelope.
 
#**Ask MCC to set beam position on 5C11b to x=-0.5 mm and y=+1.0 mm.
 
#**Ask MCC for 5C11 and 5C11B HARP. Then do our radiator HARP scan, [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Radiator_Harp_Scan see instruction]. If it looks good, proceed to next step. Otherwise, inform MCC.
 
#**Insert profiler (no need for masking FSD when an object is inserted in the photon line), run with 10×10<sup>-4</sup> radiator and 50 nA. Beam on the profiler should be at x=0.0±0.5cm; y=0.0±0.5cm. If not, inform MCC.
 
#*Radiation level study (1h):
 
#**Run 5 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA. Repeat at 100 nA and 200 nA
 
#**Run 5 min with the 10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
 
#**Run 3 min with the 3*10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
 
#*PS detector threshold scan.  (A. Somov, 1h)
 
#*Microscope yield study (row-by-row scan).  (Richard/Jim McIntyre, 1h)
 
#**Call Richard Jones <!-- 860-377-5224--> 20 min before the start of this task. Call Alex Somov to set-up the PS trigger.
 
#**Insert 5mm collimator.
 
#**[https://logbooks.jlab.org/entry/3497901 Procedure to follow]
 
#**Any type of beam quality will do.
 
#**10<sup>-4</sup> radiator, 10<sup>-3</sup> convertor, 80 nA beam current.
 
#* Photon flux optimization and Active Collimator calibration. (20 + 20 mins). Call Hovanes.
 
#**re-Insert the 10<sup>-4</sup> radiator (Call MCC). Use about 100 nA beam current. This will provide the Act. Col. nominal positions for its high gain values.
 
#**Determine maximum photon beam transmission by doing 2D scans using the collimator x/y motions (Hovanes. 1h)
 
#** Repeat procedure with 2*10<sup>-5</sup> radiator (Call MCC) and 50 nA beam current. This will provide the Act. Col. nominal positions for its low gain values.
 
#**Record on the white board what is the beam position on 5C11b and  Active Collimator for optimal photon transmission, both for low and high Act. Col. gain.
 
#**Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.
 
#Detector and beamline checkout.
 
#*Reestablish L1 trigger Alex. Somov. 2h).
 
#*Reestablish DAQ (Sergei, 2h).
 
#*General detector calibration (Sean Dobbs. <!--703-887-1776--> 1h). Use 10<sup>-4</sup> radiator.
 
#**Run 15 min (solid time) in Long Mode (Mode 10).
 
#**Run 15 min (solid time) in Production Mode (Mode 9).
 
#**CDC HV scan [https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2018_CDC_HV_scan_procedure Procedure to follow] (Naomi Jarvis, 4h)
 
#High beam current systematic test (8h. Can be done before or after diamond alignment, as most convenient for the alignment)
 
**Insert 10 μm Al. radiator (1.12*10<sup>-4</sup> RL, on amorphous rad. ladder). Take 200M events (standard prod.) at 680 nA beam current. Monitor carefully rates in wire chambers. 
 
**Insert 40 μm Al. radiator (4.49*10<sup>-4</sup> RL, on goni.). Take 200M events (standard prod.) at 170 nA beam current. Monitor carefully rates in wire chambers. 
 
#Align 17 μm diamond (JD70-104) for the 4 polarization configurations (Hovanes. 16h).
 
#Gluex data production
 
#*Physics production data with 17 μm diamond, 530 nA, 5 mm hole, 75 μm TPol convertor. Ratio of para./transverse/45<sup>o</sup>/135<sup>o</sup> data:25/25/25/25. 400M events per configuration. 2h runs <b>and no more, as it may be hard to correct for calibration drifts</b>.  Switch polarization every 400M events. Time to switch: 10min. DAQ start run overhead: 3min.
 
#*Amorphous run. Every set of 4 diam. orientation runs. 200M events. 170 nA on 40 μm Al. radiator (4.49*10<sup>-4</sup> RL, on goni.). Time to switch from pol. to unpol.: 10min.  time to switch from unpol. to pol.: 30min.
 
#*Log in run information in the shift summary (make a run list). For each production run, log useful comments on DAQ comment window, see [https://halldweb.jlab.org/hdops/wiki/index.php/Best_Practices/FAQ]
 
#*Tagger quadrupole on
 
#*Harp scans once a day: 15 min.
 
#*If commissioning and analysis are successful, once a day, a beam envelope measurement by rastering on Act. Col. <font color="red">??min</font>
 
#*Empty target run every 2 week (2h: 1<sup>-</sup> h to empty/fill back the target, 1h running). Standard production current.
 
#*Long mode 10 min run. Once a week (20 min).
 
#Align  JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) for <font color="red">2 or 4?</font> polarization configurations (Hovanes 12h) and take enough data to achieve ~1% statistic on rho polarimetry (8h at 190 nA). Decide if it is better to run on this diamond.
 
#Two TAC runs at the beginning and end of 11.6 GeV run. <font color="magenta"><b>May require other halls to be off due to bleedthrough</b></font> (Hovanes, Alex Somov 8/h run.)
 
#Luminosity scans (J. Stevens)?
 
#Some physics production data with thin diamond and 3.4 mm hole<font color="red"> 11h (1 cycles of runs). More data may be taken if beam stability and assessed polarization warranty it</font>.
 
#<font color="red">ToF runs for muon chamber? Need solid target. Need detailed plan, including time estimate</font>
 
#Parasitic TRD run
 
#During 10.2 GeV and 9.0 runs:
 
#*Re-establish good photon beam. Ion Chamber thresholds to be set each time electron beam energy changes.
 
#*<font color="red">Set PS field to rescaled value? </font>
 
#*<font color="red">Realign one of the diamond? </font>
 
#*DIRC commissionning (J. Stevens) <font color="red">Need detailed plan, including time estimate</font>
 
#* ComCal commissioning (A. Somov) <font color="red">Need detailed plan, including time estimate</font>
 
#* Gather data to be compared to CLAS results. (J. Stevens) Intersperesed with above commissioning. <font color="red">Need detailed plan, including time estimate</font>
 
#* L1 and DAQ high luminosity tests (A. Somov/S. Furletov)
 
#* <font color="red"> Luminosity scans? (J. Stevens) </font>
 
#*Straight track run (16h end of 10.2 GeV period) (Lubomir)/ComCal test (A. Somov?)
 
#**Ramp down solenoid magnet (8h)
 
#**Take straight track run data (Lubomir)
 
#**ComCal test (no B-field, no DC on)
 
#*<font color="red">ToF runs for muon chamber? Need solid target. Need detailed plan, including time estimate</font>
 
#*Parasitic TRD runs
 
 
== Hall D situation room (current run plan) ==
 
 
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]
 
 
GoogleDoc Spreadsheet of [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Statistics]
 
 
== Runplan time charts==
 
 
'''Fall 2018 time chart''':
 
[[File:Fall18_week1.jpg|70px|thumb|none]]
 
Fall 2018 commissioning/run time chart. Week 1.<br/>
 
The horizontal scale is the time during which beam is available (in other words, it would be the real time with 100% of beam efficiency).<br/>
 
The task time estimates given on the plot have 100% contingency.
 
[[File:Fall18_week2.jpg|70px|thumb|none|  ]]
 
Run time chart. Week 2.
 
[[File:Fall18_week3.jpg|70px|thumb|none|  ]]
 
Run time chart. Week 3.
 
 
----
 
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York View Runplan google calendar]
 
* [http://calendar.google.com Edit Runplan google calendar]
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
 
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Spreadsheet: number of triggers]
 
 
==Accelerator status ==
 
#* [https://cebaf.jlab.org/files/ops/accboard/ Link to accelerator short term schedule]
 
 
==Hot Checkout ==
 
# [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  <span style="color:green"> 100% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">0% not ready  </span>
 
 
==Readiness for Fall 18 run ==
 
<!--(This section is commented out for clarity) -->
 
 
*<strike>Solenoid (Eugene/Beni)
 
**Ramped to 100A, then 800A, and then back to 0A.
 
**Ready</strike>
 
**Waiting for accelerator firm delivery prediction to start ramping it up.
 
 
*Surveys (Tim/Mark)
 
***<strike>Diamonds: done
 
***TAC: done
 
***LH2 target: done
 
***(DIRC, Monday 08/20)</strike>
 
 
*<strike>DAQ  (Sergei).
 
** Running and ready.
 
** Good sample of cosmic data was taken</strike>
 
 
*Trigger (Alex S.)
 
**Need to test new software for FADC
 
 
*Beam line
 
**<strike>Diamond status (Tim/Hovanes). </strike>
 
**Tagger hodoscope (A. Somov)
 
**Tagger microscope (Beni/Richard Jones)
 
***All electronic has been turned on. Richard is checking the signals.
 
**<strike>Goniometer (Hovanes).</strike>
 
**Collimator,<strike> Active collimator, profiler, luminosity monitor </strike>(Hovanes/Alexandre Deur).
 
***<strike> Act. Col. baselines have been zeroed mid July. Checked on 08/15: they have not changed significantly.</strike>
 
*** luminosity monitor usual location is incompatible with ComCal location.
 
**PS system (Alex Somov)
 
**PS magnet (and sweeping magnet and tagger quads) will be ramped up by A. Deur when he cools the target.
 
**<strike>Polarimeter (Sebastian Cole/M. Dugger).
 
***Ready</strike>
 
**<strike>Target (Tim/Alexandre D.)
 
***LH2 Target was cooled down (test). Target ready and HCO done. </strike>
 
***Now target is warmed again, to be cooled on Aug. 21st. Cooling the target takes 6h. It will remains empty (so that there is no need to man the counting room) and be filled when needed.
 
***<font color="red"> Solid target status</font>
 
**<strike>TAC (Hovanes/Alex Somov)
 
***Ready.
 
***TDC now working. </strike>
 
****To be cured (oven) after the Fall 2018 run.
 
****During TAC runs to be inserted on beam line with 2cm offset to avoid damaged area
 
**Slow control (Hovanes).
 
***Control for DIRC and ComCal to be done, when detectors are installed.
 
**<strike>RF (Elton/Beni)</strike>
 
***Sergey F. found a flaky cable in the interface box. It is working for now but Sergey will contact Fernando about fixing this.   
 
**<strike>Radiation monitors (Alexandre D.)
 
***Ready</strike>
 
**<strike>Halo Monitors (Hovanes)
 
***Ready</strike>
 
*Detector systems
 
**<strike>ST (Mark Ito)
 
***Ready</strike>
 
**<strike>FDC (Lubomir) 
 
***One channel has failed and is turned off.
 
***Ready</strike>
 
**<strike>CDC (Beni) 
 
***Ready</strike>
 
**<strike>BCal (Elton/Mark D.)
 
***Ready</strike>
 
** <strike> FCal (Collin Gleason)
 
***Ready. HCO done.</strike>
 
**<strike>TOF (Mark Ito/Beni/Alex. Ostrovidov) 
 
***Ready</strike>
 
**DIRC (J. Stevens)
 
***Water test successful.
 
**ComCal (Alex Somov)
 
*<strike>Safety documents (Beni):
 
** RSAD and ESAD ready. </strike>
 
*Phones
 
**<font color="red"> System experts need to start carrying the on-call (charged) phones </font>
 
*Hall Status/safety (Mark/Tim)
 
*Other topics?
 
 
=== Run Planning Meetings Fall 2018 Running ===
 
*[[Run Planning Meetings Fall 2018 Running]]
 
 
=== Run Summaries ===
 

Revision as of 13:21, 29 August 2018