The Forward Drift Chamber (FDC) is a 12,672 channel system consisting
+
The Forward Drift Chamber (FDC) system consists
of four packages, each having six chambers (cells).
+
of four identical packages, each having six chambers (cells).
Each chamber has a wire plane sandwiched between two
+
These are planar drift chambers with both wire and cathode strips being readout,
cathodes consisting of readout strips. The chambers within a package
+
in total 12,672 channels.
 +
 
 +
The chambers within a package
 
have independent gas volumes, but are separated with a flexible mylar membrane.
 
have independent gas volumes, but are separated with a flexible mylar membrane.
Positive (up to 2300V) and negative (up to 500V) HV is applied on the
+
Positive (up to 2200V) and negative (up to 500V) HV is applied on the
 
sense and field wires respectively with currents
 
sense and field wires respectively with currents
not exceeding 10 $\mu $A per HV channel.
+
not exceeding 3 $\mu $A per HV channel.
 
The detector (including cables) emits a total power of about 1500~Watt,
 
The detector (including cables) emits a total power of about 1500~Watt,
 
of which about 900~Watt inside the magnet,
 
of which about 900~Watt inside the magnet,