Difference between revisions of "Gas System Commissioning"
From Hall D Ops Wiki
Line 1: | Line 1: | ||
=== Gas System === | === Gas System === | ||
− | + | * The gas system delivers an Argon-CO2 mixture to both the FDC and CDC wire chambers. It is always operational and should not stop feeding gas to the chambers. | |
− | + | * During accelerator down-times when the wire chambers are not in operation the gas flow through the chambers is reduced and the alcohol bubbler system is bypassed. | |
− | + | * For general operation and information of the gas system see [[Gas_System_Shift |Gas system for shift takers]]. |
Revision as of 12:58, 22 September 2016
Gas System
- The gas system delivers an Argon-CO2 mixture to both the FDC and CDC wire chambers. It is always operational and should not stop feeding gas to the chambers.
- During accelerator down-times when the wire chambers are not in operation the gas flow through the chambers is reduced and the alcohol bubbler system is bypassed.
- For general operation and information of the gas system see Gas system for shift takers.