Gas System Commissioning

From Hall D Ops Wiki
Revision as of 13:17, 22 September 2016 by Zihlmann (Talk | contribs) (Gas System)

Jump to: navigation, search

Gas System

  • The gas system delivers an Argon-CO2 mixture to both the FDC and CDC wire chambers. It is always operational and should not stop feeding gas to the chambers.
  • During accelerator down-times when the wire chambers are not in operation the gas flow through the chambers is reduced and the alcohol bubbler system is bypassed.
  • Before beam operations in HallD enable the alcohol bubbler system.
  • For general information and operation of the gas system see Gas system for shift takers.