Difference between revisions of "Main Page"

From Hall D Ops Wiki
Jump to: navigation, search
Line 9: Line 9:
 
<td bgcolor="#e0e0f0" valign="top">
 
<td bgcolor="#e0e0f0" valign="top">
 
* [[Introduction Shift | Introduction]]  
 
* [[Introduction Shift | Introduction]]  
* [https://misportal.jlab.org/mis/apps/physics/shiftChecklist/index.cfm Shift check-list] (A printable sheet can be found  [[Shift check-list | here]])
+
* [https://misportal.jlab.org/mis/apps/physics/shiftChecklist/index.cfm Shift check-list]. Instructions are on the HDlog [https://logbooks.jlab.org/entry/3323128 here] (A printable sheet can be found  [[Shift check-list | here]])
 
* [[Beam Line Detectors Shift | Beam Line Detectors]]  
 
* [[Beam Line Detectors Shift | Beam Line Detectors]]  
 
* [[Tagging Spectrometer Shift | Tagging Spectrometer]]  
 
* [[Tagging Spectrometer Shift | Tagging Spectrometer]]  

Revision as of 09:54, 12 March 2015

Information for Shift Takers

Training and Documentation Links

Operation References On-call List Phone

Overviews

Online Tools

Offline Analysis Links

Accelerator Links

  • Run Coordinator
  • Beamline
  • Mechanical & Solenoid
  • Drift Chambers
  • Calorimeters/Scintillators
  • DAQ/Trigger
  • Slow controls
  • Online/Analysis
  • Physics Division Liaison

  • Program Deputy
  • MCC
  • SSO
  • Crew Chief
  • Hall D Work Coordinator
  • Hall D Counting Room
  • Tagger Building
  • 383-5542
  • 769-3616
  • 544-7258
  • 383-1185
  • 354-9399
  • 383-3446
  • 383-3599
  • 383-2758
  • 328-0396

  • 876-7997
  • 269-7047, 7048
  • 269-7050
  • 269-7045
  • 876-3940
  • 269-5504, 5876
  • 269-5865, 5866, 5867


Listing of Approved Procedures

Information for Experts

Hall D Commissioning

Hall D Wiki]