Difference between revisions of "Main Page"

From Hall D Ops Wiki
Jump to: navigation, search
Line 40: Line 40:
 
* [[Data Acquisition Shift | Data Acquisition]]  
 
* [[Data Acquisition Shift | Data Acquisition]]  
 
* [[Central Drift Chamber Shift | Central Drift Chamber]]  
 
* [[Central Drift Chamber Shift | Central Drift Chamber]]  
 +
* [[Compton Calorimeter Shift | Compton Calorimeter]]
 +
* [[DIRC Shift | DIRC]]
 
* [[Forward Drift Chamber Shift | Forward Drift Chamber]]  
 
* [[Forward Drift Chamber Shift | Forward Drift Chamber]]  
 
* [[Electronics Shift | Electronics]]  
 
* [[Electronics Shift | Electronics]]  
Line 53: Line 55:
 
* [[Time-of-Flight System Shift | Time-of-Flight System]]  
 
* [[Time-of-Flight System Shift | Time-of-Flight System]]  
 
* [[Level-1 Trigger Shift | Trigger Level 1]]  
 
* [[Level-1 Trigger Shift | Trigger Level 1]]  
* [[Compton Calorimeter Shift | Compton Calorimeter]]
 
* [[DIRC Shift | DIRC]]
 
  
  

Revision as of 10:48, 20 September 2018

Information for Shift Takers

      

Operation References On-call List Phone

Overviews

Run Plan (beta)

Systems


Overviews

Online Tools

Offline Analysis Links

Accelerator Links

  • Run Coordinator
  • Beamline
  • Mechanical & Solenoid
  • Drift Chambers
  • Calorimeters/Scintillators
  • DAQ
  • Trigger
  • Slow controls
  • Online/Analysis
  • Physics Division Liaison

  • Program Deputy
  • MCC
  • SSO
  • Crew Chief
  • Hall D Work Coordinator
  • Hall D Counting Room
  • Tagger Building
  • 383-5542
  • 769-3616
  • 544-7258
  • 383-1185
  • 354-9399
  • 769-9755
  • 383-3446
  • 383-3599
  • 383-2758
  • 328-0396

  • 876-7997
  • 269-7047, 7048
  • 269-7050
  • 269-7045
  • 876-3940
  • 269-5504, 5876
  • 269-5865, 5866, 5867


Listing of Approved Procedures

Information for Experts

Hall D Commissioning

Hall D Runs

Hall D/GlueX Public Wiki

GlueX Private Wiki