Difference between revisions of "Main Page"

From Hall D Ops Wiki
Jump to: navigation, search
(Commented out the standard running condition wiki link, best practices wiki link, the time series link and the calibration browser link since they were outdated or broken.)
(One intermediate revision by one other user not shown)
Line 90: Line 90:
 
* [http://www.jlab.org/accel/ops/ops.html Accelerator Operations]
 
* [http://www.jlab.org/accel/ops/ops.html Accelerator Operations]
 
* [http://opsntsrv.acc.jlab.org/ops_docs/MCC_web_interface/interface_pages/beamline_drawings.asp Beamline Drawings]
 
* [http://opsntsrv.acc.jlab.org/ops_docs/MCC_web_interface/interface_pages/beamline_drawings.asp Beamline Drawings]
* [https://epicsweb.jlab.org/wedm/screen?edl=/cs/opshome/edm/wall/Gen_O_Wall.edl epicsweb Wall Screens]
+
* [https://epicsweb.jlab.org/ WMenu - MCC EPICS screens on epicsweb ]
 +
** [https://epicsweb.jlab.org/wedm/screen?edl=/cs/opshome/edm/wall/Gen_O_Wall.edl Wall Menu on epicsweb]
 +
* [https://accweb.acc.jlab.org/dtm/open-events Downtime Manager]
 
</td>
 
</td>
  

Revision as of 09:48, 22 November 2018

Information for Shift Takers

      

Operation References On-call List Phone

Overviews

Run Plan (beta)

Systems


Overviews

Online Tools

Offline Analysis Links

Accelerator Links

  • Run Coordinator
  • Beamline
  • Mechanical & Solenoid
  • Drift Chambers
  • Calorimeters/Scintillators
  • DAQ
  • Trigger
  • Slow controls
  • Online/Analysis
  • Physics Division Liaison

  • Program Deputy
  • MCC
  • SSO
  • Crew Chief
  • Hall D Work Coordinator
  • Hall D Counting Room
  • Tagger Building
  • 383-5542
  • 769-3616
  • 544-7258
  • 383-1185
  • 354-9399
  • 769-9755
  • 383-3446
  • 383-3599
  • 383-2758
  • 328-0396

  • 876-7997
  • 269-7047, 7048
  • 269-7050
  • 269-7045
  • 876-3940
  • 269-5504, 5876
  • 269-5865, 5866, 5867


Listing of Approved Procedures

Information for Experts

Hall D Commissioning

Hall D Runs

Hall D/GlueX Public Wiki

GlueX Private Wiki