Difference between revisions of "One Week Pause in Running"

From Hall D Ops Wiki
Jump to: navigation, search
(Created page with "__TOC__ ==Main Page== ==Tune Electron Beam== ==Tune Photon Beam== ==One Week Pause in Running== ==[[Collect Beam Data for Detector Che...")
 
(One Week Pause in Running)
 
(13 intermediate revisions by 3 users not shown)
Line 1: Line 1:
__TOC__
 
==[[Fall 2014 Commissioning Plan|Main Page]]==
 
==[[Tune Electron Beam]]==
 
==[[Tune Photon Beam]]==
 
 
==One Week Pause in Running==
 
==One Week Pause in Running==
==[[Collect Beam Data for Detector Checkout]]==
+
* Goal: Reinstall tagger detectors/electronics and check data.
==[[Optimize Detector Settings]]==
+
* Expected Schedule: See start dates in the run coordination meeting pages [https://halldweb1.jlab.org/wiki/index.php/Run_Coordination_Meetings#Meeting_General_Agenda here] and the general schedule [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan#Run_Plan here]: Duration of the pause: 6 days, depends on the accelerator program to be carried out meanwhile
==[[Drift Chamber Alignment]]==
+
* Responsibility: Hall D
==[[Collect More Regular Data]]==
+
* Priority: High
 +
* Conditions:
 +
# No beam, Tagger hall and Hall D are open.
 +
 
 +
* Acivities
 +
# Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables.
 +
# Remove upstream collimator.
 +
# Analyze the data taken so far and identify possible problems.
 +
# Use this downtime to fix the identified hardware issues.
 +
# Using reconstructed tracks find the location of the beam spot
 +
 
 +
[https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Back to main Fall14 commissioning page]

Latest revision as of 10:16, 20 October 2014

One Week Pause in Running

  • Goal: Reinstall tagger detectors/electronics and check data.
  • Expected Schedule: See start dates in the run coordination meeting pages here and the general schedule here: Duration of the pause: 6 days, depends on the accelerator program to be carried out meanwhile
  • Responsibility: Hall D
  • Priority: High
  • Conditions:
  1. No beam, Tagger hall and Hall D are open.
  • Acivities
  1. Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables.
  2. Remove upstream collimator.
  3. Analyze the data taken so far and identify possible problems.
  4. Use this downtime to fix the identified hardware issues.
  5. Using reconstructed tracks find the location of the beam spot

Back to main Fall14 commissioning page