==One Week Pause in Running==
 
==One Week Pause in Running==
# Goal: Reinstall tagger detectors/electronics and check data.
+
* Goal: Reinstall tagger detectors/electronics and check data.
# Responsibility: HallD
+
* Expected Schedule: See start dates in the run coordination meeting pages [https://halldweb1.jlab.org/wiki/index.php/Run_Coordination_Meetings#Meeting_General_Agenda here] and the general schedule [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan#Run_Plan here]: Duration of the pause: 6 days, depends on the accelerator program to be carried out meanwhile
# Conditions:
+
* Responsibility: Hall D
#* Beam off in the Hall.
+
* Priority: High
# Acivities
+
* Conditions:
#* Reinstall the tagger detector, TAGM and the electronics, reconnect the cables.
+
# No beam, Tagger hall and Hall D are open.
#* Check validity of data offline. Use as feedback to detector settings.
+
#* Check/modify the online monitoring histograms based on data.
+
  
==[[Collect Beam Data for Detector Checkout]]==
+
* Acivities
==[[Optimize Detector Settings]]==
+
# Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables.
==[[Drift Chamber Alignment]]==
+
# Remove upstream collimator.
==[[Collect More Regular Data]]==
+
# Analyze the data taken so far and identify possible problems.
 +
# Use this downtime to fix the identified hardware issues.
 +
# Using reconstructed tracks find the location of the beam spot
 +
 
 +
[https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Back to main Fall14 commissioning page]

Latest revision as of 10:16, 20 October 2014

One Week Pause in Running

  • Goal: Reinstall tagger detectors/electronics and check data.
  • Expected Schedule: See start dates in the run coordination meeting pages here and the general schedule here: Duration of the pause: 6 days, depends on the accelerator program to be carried out meanwhile
  • Responsibility: Hall D
  • Priority: High
  • Conditions:
  1. No beam, Tagger hall and Hall D are open.
  • Acivities
  1. Reinstall the tagger "microscope" (TAGM) and the electronics, reconnect the cables.
  2. Remove upstream collimator.
  3. Analyze the data taken so far and identify possible problems.
  4. Use this downtime to fix the identified hardware issues.
  5. Using reconstructed tracks find the location of the beam spot

Back to main Fall14 commissioning page